Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />8. Distribution System Improvements - <br />Cleveland Street Loop <br /> <br />9. High Pressure Transmission Pipeline to H-J <br />Trailer Court, 3,600 l.f. @ $13/l.f. <br /> <br />10. Right-of-Way and Easements <br /> <br />11. Water Rights Legal Cost Allowance <br /> <br />12. Pre-Project Costs of Meeker for Studies, <br />Ground Water Testing and Surveys <br /> <br />TOTAL PROJECT COST <br /> <br />-9- <br /> <br />$ 121,000 <br /> <br />47,000 <br />15,000 <br />6,000 <br /> <br />30,000 <br />$2,250,000 <br />