Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />\V:lter Project Construction Loan Program-Project Data <br /> <br />Borrower: <br /> <br />City of Ouray, Parks Enterpnse Fund <br /> <br />Project :\'ame: <br /> <br />Sk)Tocket Creek Deflection Structure Rehab. Project Type: Rehabilitation <br /> <br />County: <br /> <br />Oumy <br /> <br />Drainage Basin: Uncompahgre \Vater Source: Skyrocket Creek <br /> <br />Total Project Cost: <br /> <br />$133.450 <br /> <br />Funding Sources: City, Corps. DOLA and ewes <br /> <br />Type of Borrower: <br /> <br />Municipal <br /> <br />;\Iedi::m Household Income: $28.158 <br /> <br />CWCB Loan: <br /> <br />525.000 <br /> <br />Interest Rail': 3.75% <br /> <br />Term: 20 years <br /> <br />Annual Volume of Water delivered: acre-feet <br /> <br />The purpose of the project is to upgrade and improve an existing deflection structure on Sk)Tocket Creek so <br />that it can handle regularly occurring and extreme flood and/or debris flows from the steep ....1nershed area <br />above the City. The existing structure, which was built in 1929 from stones and mortar, has served a very <br />useful purpose in the past but is now considered to be at structural risk due to its age. The proposed project <br />\\i1l bnng the system up to acceptable engmeering standards, and will help to protect the City's CItizens. <br />businesses. visitors, and tnfrastructure. Feasibility studies have been completed by Mussetter Engineering, Inc. <br />m 1997 and A}TeS Associ:nes in December 1997. <br /> <br />I <br />I <br /> <br /> <br />Location Map <br />