My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00085
CWCB
>
Publications
>
Backfile
>
PUB00085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:15:20 PM
Metadata
Fields
Template:
Publications
Year
1999
Title
Construction Fund Annual Report 1999
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1999
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TOWN OF JOIINSTOW,," - LONE TREE PIPELINE RECONSTRUCTION PROJF.CT <br /> <br /> <br />Placement of the 16 inch Diameter- - Ductile Iron Pipeline <br /> <br />Proiect Description <br /> <br />This 52,700.000 project includes the replacement of I t miles of open ditch with a 14- 16 <br />inch pipeline from Lonetree Reservoir to the TO\m of Johnstown's \\'aler treatment plant induding <br />a booster station at lhe reservoir and connection facilities at the treatment plant. PRe <br />Environmental Management. Inc. of Denver designed the project. The construction contract was <br />awarded to Hall-Irwin Construction Co. (pipeline) of Greeley and B.T. Construction. Inc. (pump <br />station/electrical) of Broomlield August 6, 1996. Construction commenced in early October 1996 <br />and was completed in May 1998. Project documentation and tinal accounting delayed substiUltial <br />completion until June 30. 1999. <br /> <br />Proiect Data <br /> <br />Sponsor: TO\\11 of Johnslo\'.:n <br /> <br />County: Larimerl\Veld <br /> <br />Rinr: Big Thompson River <br /> <br />Terms of Loan: 51.948,932.60@4%for30)TS. <br /> <br />Substantial Completion nate: June 30,1999 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Design Engineer: PRe Environmental ~lanagement. Inc. - Denver, Colorado <br /> <br />Construction Contractor: Hall.lrwin Construction. Inc. - Greeley, Colorado <br />8.T. Construction, Inc. - Broomfield. Colorado <br /> <br />Design Criteria: <br /> <br />Length of Pipeline = approx. II miles <br />Pipeline diameter = 14 - 16 inch <br />Pipeline ~taterial = Ductile Iron Pipe <br /> <br />Annual Volume of Water Delinred by the Project: 2.100 ac.tl. <br />
The URL can be used to link to this page
Your browser does not support the video tag.