Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TOWN OF JOIINSTOW,," - LONE TREE PIPELINE RECONSTRUCTION PROJF.CT <br /> <br /> <br />Placement of the 16 inch Diameter- - Ductile Iron Pipeline <br /> <br />Proiect Description <br /> <br />This 52,700.000 project includes the replacement of I t miles of open ditch with a 14- 16 <br />inch pipeline from Lonetree Reservoir to the TO\m of Johnstown's \\'aler treatment plant induding <br />a booster station at lhe reservoir and connection facilities at the treatment plant. PRe <br />Environmental Management. Inc. of Denver designed the project. The construction contract was <br />awarded to Hall-Irwin Construction Co. (pipeline) of Greeley and B.T. Construction. Inc. (pump <br />station/electrical) of Broomlield August 6, 1996. Construction commenced in early October 1996 <br />and was completed in May 1998. Project documentation and tinal accounting delayed substiUltial <br />completion until June 30. 1999. <br /> <br />Proiect Data <br /> <br />Sponsor: TO\\11 of Johnslo\'.:n <br /> <br />County: Larimerl\Veld <br /> <br />Rinr: Big Thompson River <br /> <br />Terms of Loan: 51.948,932.60@4%for30)TS. <br /> <br />Substantial Completion nate: June 30,1999 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Design Engineer: PRe Environmental ~lanagement. Inc. - Denver, Colorado <br /> <br />Construction Contractor: Hall.lrwin Construction. Inc. - Greeley, Colorado <br />8.T. Construction, Inc. - Broomfield. Colorado <br /> <br />Design Criteria: <br /> <br />Length of Pipeline = approx. II miles <br />Pipeline diameter = 14 - 16 inch <br />Pipeline ~taterial = Ductile Iron Pipe <br /> <br />Annual Volume of Water Delinred by the Project: 2.100 ac.tl. <br />