My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00085
CWCB
>
Publications
>
Backfile
>
PUB00085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:15:20 PM
Metadata
Fields
Template:
Publications
Year
1999
Title
Construction Fund Annual Report 1999
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1999
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />\\'A~ISLE\' CATTLE CO~IPAI'\' - POLE ~IOU"'TAIIO DA,\I REIIABILlT ATlOI' <br /> <br />i <br /> <br /> <br />- <br /> <br /> <br />~ <br /> <br />, <br /> <br />~ <br /> <br />_ __~ 0:::..... <br />..,. --' JJ'-:- ~ <br />_..;..-......1.......,~ .-:. <br />-~':'... '._ -I -..;....>:,..,-;."'~~ <br />... ...",,'" . -~6....:-it:: --' ......~ <br />~~. .'-,.," - -" .-:: <br />~ <br /> <br />Excavation and Grading Work from the Dams Right Abutment <br /> <br />Proiect DescriDtion <br /> <br />This small dam rehabilitation project commenced in March 199-l by the owners of the <br />\Vamsley Caulc Company. The project consisted of replacing the reservoir's outlet structure and <br />Ilattenmg the dam's upstream slope. Smith Geotechnical Engineering (SGE) of Fl. Collins <br />completed the project design. The project was constructed under the supervision of SGE and the <br />State Engineer's Office by the owner's own forces. The owner completed the work after several <br />years of elTart bet\l.:een ranching, fanning and construction. The Stale Engineer's Office recently <br />approved the reservoir's tilling plan and substantial completion was June 30. 1999, <br /> <br />Proiect Data <br /> <br />Sponsor: Wamsley Cattle Company <br /> <br />Count): Jackson <br /> <br />Rinr: OIT.Slream Drainage <br /> <br />Terms of Loan: S3-l,036..H @ 3'v'l tor -l0 yrs. <br /> <br />Substantial Completion Date: June 30.1999 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Design Engineer: Smith Geotechnical Engmeenng ~ Ft. CoHms. Colorado <br /> <br />Construction Contractor: Wamsley Cattle Company Owners - Coalmont, Colorado <br /> <br />Design Criteria: <br /> <br />Dam Height = 115 feet <br />Length ofCresl = 7S~ feet <br />Outlet = ~SO ft. long. ~-l mch dIameter steel pIpe <br />A\'c.U.Sslope=-l-1 Ave D,Sslopc=2.2.1 <br /> <br />Annual \'olume of\\";Uer Delin'red by the Project: 1.905 ac.tt. <br />
The URL can be used to link to this page
Your browser does not support the video tag.