Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />BUFFALO ~IUTUAI.IRRIG,\T10:\' CO-DI\'ERSIO:\, STRUCTURE REIIABILlT.,\!'IO:\' <br /> <br /> <br />The Ditch Company Officers Operating Their i'\e\\' lIeadgates <br /> <br />Proiect Description <br /> <br />This 5600.000 prOject was the re-construction of the Buffalo Mutual Irrigation Company's <br />diversion structure and hcadgatc on the Arkansas River in Prowers County 17 miles east of the City <br />of Lamar. The eXIsting steel and \....ood darn and headgate had been in place for more than 50 years <br />and was structurally deficient. Wnght Water Engineers of Denver. Colorado completed project <br />design and preparation of construction conlract documents. The construction conlract was 3\varded <br />to TLM Constructors. lnc. of Swink. Colorado and construction commenced September 21. 1998. <br />The project was completed In June 1999. <br /> <br />Proiect Data <br /> <br />Sponsor: Buffalo i\.lutuallrrigation Company <br /> <br />County: Prowers <br /> <br />Rinr: Arkansas River <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Terms of Loan: S-l53.250@: 3.75% for 30 yrs. <br /> <br />Substantial Complelion Date: June 1-l.1999 <br /> <br />Design Engineer: \Vright Water Engineers ~ Denver. Colorado <br /> <br />Conslruction Conlractor: TL:.1 Constructors. Inc. - Swink. Colorado <br /> <br />Design Crileria: <br /> <br />Length ofOvertlow DI\'erslon Structure = 200 fee:t <br />Dl\'ersion Headgale = 3 - 5 ft. x 6 f1. slide: gales <br />Headgate Flushing Structure = I - 6 ft. \ -l Jt.slidc gale <br /> <br />Annual Volume of \Vater Deli\'Cred b~ the Projcct: 17.560 ae.ft. <br />