Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />GREEI.EY & I.OVELA:'>D IRRIGA no:,> co. - EQUALIZER DA,\I REIIABILlT A TIO:'> <br /> <br /> <br /> <br />. <br />.,.- <br /> <br />P.-oieCI Descriplion <br /> <br />This $385.000 project was the rehabilitation of the Greeley & Loveland Irrigation <br />Company's Equalizer Reservoir located east of Loveland. The project included replacement of the <br />dam outlet gate with a new structure. which incorporated both the outlet gale and a spillway. The <br />existing dam embankment was also raised almost four feet. Eer Consultants. Inc. of Englewood <br />prepared the construction plans and spccitications with the construction contract awarded to <br />Schmuesor and Associates. Inc. of \Vheatridge. CO. Construction commenced on November 16. <br />1998. was completed in early March 1999. with Substantial Completion on May 7. 1999. <br /> <br />ProiecIOal3 <br /> <br />Sponsor: Greeley & Loveland Irrigation Co. County: Larimer <br /> <br />River: Big Thompson River <br /> <br />Terms of Loan: 5308.000 @ -J.2 I % for 30 yrs. <br /> <br />Substantial Completion Date: May 7,1999 <br /> <br />Design Engineer: ECI Consultants. Inc. - Englewood. Colorado <br /> <br />Construction Contractor: Schmuesor and Associates. Inc. - \V'heatridge. Colorado <br /> <br />Design Criteria: <br /> <br />Length of Dam Crest == 2.600 ft. <br />Volume of ReserVOir = 1.700 ac.ft. <br />Outlet Gate = 5 - 4 ft. x ~ n. slide gates <br />100 - Year Emergency Spillway = 20 ft. long x 9 It. high <br /> <br />Annual Volume of Water Oelinred by [he Project: SS5 ac.ft. <br />