My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00085
CWCB
>
Publications
>
Backfile
>
PUB00085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:15:20 PM
Metadata
Fields
Template:
Publications
Year
1999
Title
Construction Fund Annual Report 1999
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1999
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />WESTER;'; ~IUTUAI. lllTCH CO. - CHECK ll.-\~I REIIABII.IT.-\TIO:O; PRO.JEer <br /> <br /> <br />Looking D/S at the Check Dam ...\Ioog the Side-Channel \\"(>St of rhe ;\Iain Ch:lnnel Uivenion <br /> <br />Proiect Description <br /> <br />This project is the construction of a side-channel check dam \vest of the Western Mutual <br />Ditch Company's main diversion structure on the South Platte River wcst of Platteville. The <br />structure IS designed to back up slde-channel water during low flows. re..Jirccting it to\\:ard the <br />ditch bead-gates located on the opposite bank of the nver's main channel. The project was <br />designed by Rocky ~lountain Consuhanls of Longmont. CO. and constructed by Kemp & <br />HolTman. Inc. of Northglenn. CO. After a lengthy right-of-way and access dispute with the <br />adjacent property owner the project commenced in January 1999 and was completed in March <br />1999. <br /> <br />Proiect Data <br /> <br />Sponsor: \Vestern ~lutllal Ditch Company Count):: Weld <br /> <br />Rher: South Platte River <br /> <br />I <br />I <br />I <br />I <br /> <br />Terms of Loan:S 100.000 (CX 3.75'~'o for 20 yrs Substantial Completion Dale: ~tar. 10.1999 <br /> <br />Design Engineer: Rocky ~Iountain Consultants. Inc. Longmont. Colorado <br /> <br />Construction Conlractor: Kemp & HolTtnan. Inc. - Northgh:nn. Colomdo <br /> <br />Design Crileria: <br /> <br />Length of Chcrk Dam -= 120 fect <br />HClght of Check Dam -= -; fcet <br />Type of Dam -= Stcel Shecl Pllmg wllh Treated TImber Fbshhoards <br /> <br />Annual \'olumt' of Water Oelh ered hy the Project: 20.000 ac.IL <br /> <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.