Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />WESTER;'; ~IUTUAI. lllTCH CO. - CHECK ll.-\~I REIIABII.IT.-\TIO:O; PRO.JEer <br /> <br /> <br />Looking D/S at the Check Dam ...\Ioog the Side-Channel \\"(>St of rhe ;\Iain Ch:lnnel Uivenion <br /> <br />Proiect Description <br /> <br />This project is the construction of a side-channel check dam \vest of the Western Mutual <br />Ditch Company's main diversion structure on the South Platte River wcst of Platteville. The <br />structure IS designed to back up slde-channel water during low flows. re..Jirccting it to\\:ard the <br />ditch bead-gates located on the opposite bank of the nver's main channel. The project was <br />designed by Rocky ~lountain Consuhanls of Longmont. CO. and constructed by Kemp & <br />HolTman. Inc. of Northglenn. CO. After a lengthy right-of-way and access dispute with the <br />adjacent property owner the project commenced in January 1999 and was completed in March <br />1999. <br /> <br />Proiect Data <br /> <br />Sponsor: \Vestern ~lutllal Ditch Company Count):: Weld <br /> <br />Rher: South Platte River <br /> <br />I <br />I <br />I <br />I <br /> <br />Terms of Loan:S 100.000 (CX 3.75'~'o for 20 yrs Substantial Completion Dale: ~tar. 10.1999 <br /> <br />Design Engineer: Rocky ~Iountain Consultants. Inc. Longmont. Colorado <br /> <br />Construction Conlractor: Kemp & HolTtnan. Inc. - Northgh:nn. Colomdo <br /> <br />Design Crileria: <br /> <br />Length of Chcrk Dam -= 120 fect <br />HClght of Check Dam -= -; fcet <br />Type of Dam -= Stcel Shecl Pllmg wllh Treated TImber Fbshhoards <br /> <br />Annual \'olumt' of Water Oelh ered hy the Project: 20.000 ac.IL <br /> <br />I <br />I <br />