My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00085
CWCB
>
Publications
>
Backfile
>
PUB00085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:15:20 PM
Metadata
Fields
Template:
Publications
Year
1999
Title
Construction Fund Annual Report 1999
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1999
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />llURKEE lllTCH CO~II'A1'iY - llURKEE lllTCll PIPEU1'iE PROJECT <br /> <br /> <br />'- <br /> <br />.~ .~ <br /> <br />- . <br /> <br />~. <br /> <br />-., ~- <br /> <br />The Owner and Design Engineer Inspecting the Pol)"eth)'lcnc Pipe <br /> <br />Proiect Description <br /> <br />This project was the construction of 3.500 linear feet of 36 inch diameter polyethylene (PEl <br />pipe and appurtenant inlet and outlet structures. replacing an open irrigation ditch. The extremely <br />Hal grade of the ditch resulted in algae grO\vth which reduced the How carrying capacity of the <br />ditch. The Delta and Grand Junction Offices of the Natural Resource Conservation Service <br />designed the project that was constructed by K.C. Equipment and Construction Company of Delta. <br />CO. The project was built in two phases commencing in September 1997 and was substantially <br />compleled in ~tarch 1999. <br /> <br />Proiect Data <br /> <br />Sponsor: Durkee Ditch Company. Inc. <br /> <br />Count)"; Delta <br /> <br />Rinr: Currant Creek <br /> <br />Terms oflo.ln: $95.000 ra:~ 3.75% for 30 ....rs. <br />'- ' <br /> <br />Substantial Completion Date: Mar. 9. 1999 <br /> <br />Dcsi,::n F.n~ineer: Natural R~source Conservation Service - Delta and Grand Junction Otlices <br /> <br />Construction Contractor: K.C. Equipment and Construction Company - Delta. Colorado <br /> <br />Design Criteria: <br /> <br />Length of Pipe = 3.500 linear ft. <br />Pipe Diameter = 36 in. <br />Type or Pipe = Black Corrugat~d Polyethylene ePE) <br /> <br />Annual Volume of Water Delinred b~ the Project: 2.000 ac.n. <br />
The URL can be used to link to this page
Your browser does not support the video tag.