My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00085
CWCB
>
Publications
>
Backfile
>
PUB00085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:15:20 PM
Metadata
Fields
Template:
Publications
Year
1999
Title
Construction Fund Annual Report 1999
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1999
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />L.EFT 11.-\;-';0 OITCII CO. - L.EFT 11.-\1'0 \'AI.L.EY lIES. SPII.LW.-\ Y/OUTLET REHAB. <br /> <br /> <br />The Concrete Scillin~ Basin and Outlet Pipe at Ihe Bottom of the RCC Spillway <br /> <br />Proiect DescriDtion <br /> <br />ThiS project is the result of the State Engineer's order to Increase the spillway capacity of <br />the Left Hand Valley Reservoir in order to comply \\'lIh dam safety nlies and regulations regardmg <br />downstream structures. The project includes the replacement of the current spill\l.:ay with a larger <br />roller compacted concrete (RCC) spillway and concrete sill ling basin. Rocky ~Iountain <br />Consultants of Longment. CO completed the penmtting process. design engineering and <br />preparation of construction contract documents. The construction contract ,....as awarded (0 Gears. <br />Inc. ofCrcsteu Butte. CO.. commenced September 1. 1998 and was completed In January 1999. <br /> <br />Proiect Data <br /> <br />Sponsor: Left Hand Ditch Company. Inc, <br /> <br />CounlY: Boulder <br /> <br />Rinr: Left Hand Creek <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Terms of Loan: 5560.000.00 @ ~.ooo for 30 yrs. <br /> <br />Substantial Complerion Date: Jan. 13, 1999 <br /> <br />Desi2n Engineer: Rocky \lounlaln Consultants, Inc. - Long.mont. CQlorJdo <br /> <br />Construction Contractor: Gears. Inc. Crested Bune. Colorado <br /> <br />Design Criteria: <br /> <br />Dam Height = 51 2.5 n. Dam Crest Elev. = 5.359.5 ft, <br />Spillway Crest EIc\'. = 5.351.5 fl, ReserVOIr Capacity = 2..81-1 aC.ft. <br />Spillway Type = Step(Xd Roller Compacted Concrete <br /> <br />.-\nnual "olume of Waler ()eli\'ered b~ the Project: 1.62.-1 ae.li. <br />
The URL can be used to link to this page
Your browser does not support the video tag.