My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00085
CWCB
>
Publications
>
Backfile
>
PUB00085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:15:20 PM
Metadata
Fields
Template:
Publications
Year
1999
Title
Construction Fund Annual Report 1999
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1999
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />.-\GIUCULTURAL DITCH & RES. CO. -.-\G DITCII/WELCH DITCH I~IPRO\'DIE:-;TS <br /> <br /> <br />The Agricultural Ditch Pump Station at Colfax Avenue and Orchard Drive <br /> <br />Proiect Description <br />This $-tOO.OOO+ project. located in JetTerson County east of Green Moumanin. abandoned <br />portions of the \Velch Ditch by construction of a dropout structure on the \Velch Ditch to the Ag <br />Ditch. and a pump station/pipeline to lift water from the Agricultural Ditch back to the \Velch <br />Ditch. Several landslide areas along the \Vetch Ditch that continued to create high maintenance and <br />"~cater deli\'cry problems for the company necessitated the project Mountain States Engineering <br />Associates. Inc. of Lakewood prepared the project design. The pipeline. constructed by T. Lowell <br />Construction. Inc. of Castle Rock. and the pump station and dropout-structure. constructed by <br />Jennison Construction Co. of Littleton. commenced November 3. 1997 were completed in July <br />1998. Project documenlation was received for substantial completion on October 31. 1998. <br />Proiect Data <br /> <br />Sponsor: Agricultural Ditch & Res. Co. <br /> <br />County: Jefferson <br /> <br />Rinr: Clear Creek <br /> <br />I <br />I <br /> <br />Terms of l.oan: 5300.000 @ 5.251% for 30 yrs <br /> <br />Substantial Completion Date: Oct. 31. 1998 <br /> <br />Design Engineer: Mountain States Engineering Associates. Inc. - Lakewood. Colorado <br /> <br />I <br />I <br />I <br />I <br /> <br />Construction Contractors: T. Lowell Construction. Inc. - Castle Rock. Colorado (pipeline) <br />Jenmson Construction Company. Inc. - Littleton. Colorado <br /> <br />Oesign Criteria: <br /> <br />PIpeline Length -= 5.000 It. of various dia. <br />Pump Station"" J - 75 HP pump mOlors <br /> <br />P\'C pipe <br />Dropout Pipe"" 36 tn. CMP <br /> <br />Annual "olume of Water Delinred by the Project: 1.000 ae.ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.