Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />HAWKEYE LATERAL DITCfI CO~IPA:-iY -HAWKEYE LATERAL DITCH REHAB. <br /> <br /> <br />Delivery of the 36 in. ReinForced Concrete Pipe <br /> <br />Proiect Description <br /> <br />This $490,000 project was the construction of approximately 13.000 linear feet of pye <br />and RCP pipeline, with new headgare and appurtenances. replacing an existing open concrete <br />lined ditch in poor condition for the Hawkeye Lateral Ditch Company in f\.lesa Coumy northeast <br />of Fruila. The Grand Junction Oftice of the Natural Resource Conservation Service prepared the <br />project design that was constructed by M. A. Concrete Construction, Inc. of Grand Junction. <br />Colorado commencing November 7. 1997. Construction was completed in ~lay 1998 with <br />substantial complelion on August 17. 1998. <br /> <br />Proiect Data <br /> <br />Sponsor: Hawkeye Lateral Ditch Co. County: Mesa Rinr: Colorado via Grand Valley Canal <br /> <br />Terms of Loan: SI5.U 13 @3.75% for 30 yrs. <br /> <br />Substantial Completion Dare: Aug. 17,1998 <br /> <br />Design Engineer: Natural Resource Conservation Service. Grand Junction. Colorado <br /> <br />Construction Contraclor: ~t.A. Concrete Construction. Inc. - Grand Junction. Colorado <br /> <br />Design Criteria: <br /> <br />1.800 ft. - 36 in. dia. reinforced concrete pipe (RCP) <br />11...l15 ft. - 3 In. to 27 in. dia. poly-vinyl.chloride (PVC) pipe <br />23 each - 6 in. to 12 in. gate valves <br /> <br />Annual Volume of \\'ater Delin'red by the Projecl: 1.260 ae.ft. <br />