My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00085
CWCB
>
Publications
>
Backfile
>
PUB00085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:15:20 PM
Metadata
Fields
Template:
Publications
Year
1999
Title
Construction Fund Annual Report 1999
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1999
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TO\\''-; OF MORRlSO:<l- RA \\' WATER PIPEU.-;E REHABILIT ATlO:<l <br /> <br /> <br />The t6"IIDPE Tr:msmission Line Encased in a 22" Steel Pipe Suspended Above Bear Creek <br /> <br />Proiect Description <br /> <br />I <br />I <br />I <br /> <br />This $445,()(X) project was the construction of a new raw water grit chamber and <br />transmission line replacing a similar functionally obsolete facility for the Town of Morrison in <br />Jefferson County. The project consisted of a new concrete grit chamber at the Bear Creek <br />diversion structure and construction of approximately 900 feel of Duclile Iron and HDPE <br />transmission pipeline along a precarious canyon wall. Mclaughlin Water Engineers. Inc. of <br />Denver prepared lhe project design that was constructed by l.R. Walton Construction Co. of <br />Indian Hills. Colorado commencing OClOber 1. 1997. Construction was completed in May 1998 <br />wilh subslaJllial completion on July 22. 1998, <br />Proiect Data <br /> <br />Sponsor: Town of Morrison <br /> <br />Count)": Jefferson <br /> <br />River: Bear Creek <br /> <br />I <br />I <br /> <br />Terms of LOo1n: $334.053 @ 5.0% for 30 yrs. <br /> <br />Substantio1l Completion Date: July 22. 1998 <br /> <br />Design Engineer: McLaughlin Water Engineers. lnc, - Denver. Colorado <br /> <br />Construction Contractor: J.R, \Valton ConslIUction Company. Inc. -Indian Hills. Colorado <br /> <br />I <br />I <br />I <br />I <br /> <br />Design Criteria: <br /> <br />720 ft. - 16" dia. ductile iron pipe (buried) <br />180 ft. - 16" dia, HOPE pipe encased in n" dia. steel pipe (suspended) <br />.u (L.x S ft, by lOft. deep reinforced concrete gnt chamber <br /> <br />Annual "olume of ,,'ater DeJjnred by lhe Project: 6:!5 ac.ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.