Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />C!lJPPERFlELO LA:<iE OnCII,I:<ic. - CIIPPRfLO LA:<iE onclI REHABILITATIO:'<l <br /> <br /> <br />Looking toward the i\luha Trioa Ditch at the Ne,," -J-bay Concrete Dh..ision Box <br /> <br />Proiect DescriPtion <br /> <br />This 555,000 project from the 1998 Small Project Loan Account is the construction of <br />10.000 feet of pipeline replacing an existing open ditch in poor condition. The project also <br />consisted of fe-construction of the existing hcadgate structure and a new division box at the Multa <br />Trina Ditch. The Glenwood Springs ollice of the Natural Resources Conservation Service prepared <br />the project design. Project construction commenced November 1. 1997 by the Ditch Company's <br />0\'111 forces. The project was completed in May 1998 with substantial completion on June I, 1998. <br /> <br />Proiect Data <br /> <br />Sponsor: Chipperfield Lane Ditch. Inc. <br /> <br />County: Gartield <br /> <br />Rinr: 01)' Hollow Creek <br /> <br />Terms of Loan: $41,011.94@3.75% for 30 }TS, Substantial Completion Date: June I. 1998 <br /> <br />Design Engineer: Natural Resources Conservation Service - Glenwood Springs Office <br /> <br />Construction Contractor: Chippertield Lane Ditch. Inc. Members <br /> <br />Design Crileria: <br /> <br />10.000 lineal feet - 8 Inch diameter PVC pipe <br />1 - 8 11 x 11 fl x ~ t1 ~.bay Concrete Dl\'ision Box <br /> <br />Annual \'olu01e of Water Delh'ered by the Project: 110 ac.li. <br />