Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />PROPOSED PROJECT <br /> <br /> <br />In order to restore the facility to 100 percent uti- <br /> <br /> <br />lization, it will be necessary to reconstruct the embankment <br /> <br /> <br />frontface, including placement of additional fill material, <br /> <br /> <br />filter gravel, and riprap and raise the crest of the dam to <br /> <br /> <br />provide proper freeboard. In addition, a new outlet system <br /> <br /> <br />will be required. This will entail breaching the dam, removing <br /> <br /> <br />existing structures, and constructing new reinforced concrete <br /> <br /> <br />outlet works. The new outlet would include a new intake trash <br /> <br /> <br />rack, a new control gate, a new energy dissipator, and a new <br />reinforced concrete outlet Conduit. <br />The total cost of rehabilitating the structure is es- <br />timated at $500,000.00. North Poudre would pay half and fund <br />half through the Colorado Water Conservation Board. <br /> <br />AVH:clp-403 <br /> <br />- 3 - <br />