Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />POl'DRE VALLEY CA:'iAL SLIDE STABILlZATlO:'i PROJECT <br /> <br /> <br />The Poudre Valle,- Canal Under Construction looking south just east of U.S.287 <br /> <br />Proiect Description <br /> <br />This Emergency Infrastructure Repair Loan was necessitated by the Poudre Valley Canal's <br />development of severe cracking and leakage resulting in a major landslide which threatened to <br />breach the canal as well as block traffic on U.S. Highway 287 north of Ft. Collins. <br /> <br />The project consisted of lining 1.000 feet of the canal with reinforced concrete and the <br />removal of several feet of the canal bank. The work reduced the driving force of the landslide <br />thus stabilizing the slide and eliminating the seepage which \I':as lubricating the slide path. <br /> <br />Proiect Data <br /> <br />Sponsor: Windsor Reservoir & Canal Company County: Larimer <br /> <br />Ri'"er: Cache la Poudre <br /> <br />Terms of Loan: S300.000 @ ...25% for 30 years Annual Payment: S 17.879 <br /> <br />Design Engineer: Smith Geotechnical Consultants - Fe Collins. Colorado <br /> <br />Contractor: Barker Construction Company. Inc. - Ft. Collins. Colorado <br /> <br />Design Criteria: Reinforced concrete lined canal - 1.000 lineal feet <br />V-shaped Canal - Depth: 6 feet Width: I: feet <br /> <br />Design Q = 400 c.fs. <br /> <br />Annual Volume of Water Delinred by Project: 23.000 acre-feet <br />