Laserfiche WebLink
<br />I <br />I <br /> <br />RA:\GELY WATER I:\TAKE STRUCTURE REPLACDIE;>\T <br /> <br />I <br />I <br />I <br />I <br /> <br />------- <br /> <br />J <br /> <br />---------- <br />---- <br /> <br />--------- <br />I- <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />~~. <br />"""l"': , <br />- - <br /> <br />-<. <br />~i.. <br />.:')-~'- . <br /> <br /> <br />.~ <br /> <br />The Rangely Ra"' \Valer Intake Pump House looking north toward the \\'hile Rinr <br /> <br />Proiect Description <br /> <br />This Emergency Infrastructure Repair Loan was necessitated by the imminent failure of <br />the TO\m of Rangely's raw water intake structure on the White Ri....er. <br /> <br />Included in the project was the fe-construction of the raw water intake structure and the <br />construction of a pump house sheltering two ne\\" 2.500 gpm pumps. Raw water from the site <br />is pumped from the Intake Structure to the Rangely water treatment plant approximately l/4 mile <br />away. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Proiect Data <br /> <br />Sponsor: T O\\TI of Rangely <br /> <br />County: Rio Blanco <br /> <br />Rinr: \\ bite Ri\'er <br /> <br />Terms of Loan: 534.000 ~' 4.5% for 2 years <br /> <br />Annual Payment: 518.156 <br /> <br />Design Engineer: Schmueser. Gordon & ~teyer - GleO\\,;ood Springs. Colorado <br /> <br />Contractor: Town of Rangely - General Contractor <br />Building. \Iechanical and Electrical Sub-Contractors <br /> <br />Desi~D Criteria: <br />1 - 20'x :!6' metal building 1 - 1.500 gpm self priming centrifugal Pwnps <br />Associated pipes. fittings and appunenances <br />All electrical conduits. fixtures and accessories. <br /> <br />Annual Volume of \Vater Oelhered b~- Project: 0.5 ~IGD = 560 acre feet <br />