My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00059
CWCB
>
Publications
>
Backfile
>
PUB00059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:23 PM
Creation date
9/30/2006 10:10:45 PM
Metadata
Fields
Template:
Publications
Year
1995
Title
Construction Fund Annual Report 1995
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1995
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br /> <br />~IOU;\,TAI;o.; HO~IE RESERVOIR SPILLWAY A:'\D OUTLET WORKS <br /> <br />I <br />I <br />I <br />I <br /> <br /> <br />- <br /> <br />I <br />I <br />I <br /> <br />"- <br /> <br />Mountain Home Resen"oir Outlet Flume <br /> <br />Proiect DescriDtion <br /> <br />I <br /> <br />The project consisted of construction of a concrete spillway. ralsmg the crest of the <br />Mountain Home Reservoir dam. and reconstructing the downstream end of the dam' s outlet <br />structure. <br />Storage restrictions on the reservoir. due to an inadequately sized spillway. were remo\"ed <br />by the construction of the new concrete spillway. The poorly consolidated upper embankment <br />soils of the dam were repaired by raising and re-consolidating the dam crest. <br />The lower reaches of the outlet works were leaking badly and in poor repair. Re- <br />constructing this portion of the outlet works relieved significant erosion dO\\TIstream of the <br />reserVOIT. <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />Proiect Data <br /> <br />Sponsor: Trinchera Irrigation Company <br /> <br />Count~.: Costilla <br /> <br />Rinr-: T rinchera Creek <br /> <br />I <br />I <br /> <br />Ter-ms of Loan: 5980.675 @ 1% for 40 years <br /> <br />Annual Payment: 529,871 <br /> <br />Design F.ngineer-: Smith Geotechnical Consultants. Fe Collins. Colorado <br /> <br />Contr-aclor: ASI-RCC. Inc. - Buena Vista. Colorado <br /> <br />I <br />I <br /> <br />Design Cr-iter-ia: <br />Spillway Crest: 200 feet <br />Outlel Structure: Twide x 8'high concrete flwne <br /> <br />Annual Volume of \\'ater- Remond fr-om Stor-age Restr-iction b~' Pr-oject: 7.351 acre-feet <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.