My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cherry Creek Valley Risk Assessment Workplan
CWCB
>
Water Conservation
>
Backfile
>
Cherry Creek Valley Risk Assessment Workplan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2011 1:32:54 PM
Creation date
9/30/2006 9:04:34 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Ag/Muni Grant
Contract/PO #
C153776
Applicant
Cherry Creek Water & Sanitation District
Project Name
Wabash Risk & Reliability Assessment Project
Title
Project Description
County
Denver
Water Conservation - Doc Type
Work Plan
Document Relationships
Cherry Creek Valley Risk Assessment Applic
(Attachment)
Path:
\Water Conservation\Backfile
Cherry Creek Valley Risk Assessment Contract
(Attachment)
Path:
\Water Conservation\Backfile
Cherry Creek Valley Risk Assessment Final Report
(Message)
Path:
\Water Conservation\Backfile
Cherry Creek Valley Risk Assessment Letter
(Attachment)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br /> ACTIVITY RESPONSIBILITY T1MELlNE COSTS <br />Protect Descriotion: <br />The Project consists of the Contractor developing an <br />assessment procedure for evaluating the reliability of small NA NA NA <br />water supply development projects that capture urban <br />runoff as a conserved replacement supply. <br />Goals & Obiectives: <br />The goal of the Project is to: <br />L Develop a risk assessment procedure that translates the NA NA NA <br /> existing water supply yield into a conservation yield <br /> reliability. <br />Proiect Planning: <br />L Verify with the State Engineer's Office that all water S. Boand with review by 5/1/97 - $2,200 <br /> right concerns are addressed and needed applications J. Warford and 6/15/97 <br /> have been filed, and that there are no potential C. ladarola <br /> conflicts. <br />2. Update Wabash Complex Runoffi'Water Yield Model <br /> for automated operation and output. <br />3. Update analysis period to include post 1986 climatic <br /> data and water rights call data_ <br />Proiect Implementation: <br />L Develop analysis program for Wabash Complex_ C. Iadarola and S. Boand. 6/15/97 - $1,250 <br />2_ Develop supply/demand scenarios for modeling Supply/Demand 7/31/97 $2,800 <br /> program. scenarios developed with <br />3_ Complete model runs at various demands. J _ Warford <br />Publicity & Promotion: <br />The Contractor will present final analysis to local water S. Boand & C. ladarola 10/97 $600 <br />conservation groups. and J. Warford <br />EvaluationlFinal Report: <br />L Summary of the Project S. Boand & c. ladarola 12/15/97 $1,600 <br />2. Project implementation and J _ Warford <br />3. Project findings and water usage <br />TOTALS 5/1/97- $8,450 <br /> 12/15/97 ($4,225) <br /> (Grant Funds) <br />
The URL can be used to link to this page
Your browser does not support the video tag.