Laserfiche WebLink
<br />l <br />\ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />STERLING W T CONSERVATION PLAN <br /> <br />MAY 28, 1996 <br /> <br />Mare 69 - Actively publicize voluntary lawn watering restrictions <br />7-Water rate structure designed to encourage water use <br />Measure 7a - Universal metering and meter replacement program <br />Measure 7b - All City water use metered and on metered rate <br />Measure 7c - Unifonn rate structure <br />8-Regulatory measures, including ordinances and codes <br />Measure 8c - Drought emergency response contingency plan <br />Measure 8e - Require installation of low-flow showerheads, toilets and low-flow <br />faucet aerators at time of Building Pennit for remodeling <br />Measure 8f - Develop code amendments pennitling use of greywater from bathtubs, <br />showers and bathroom and kitchen sinks for irrigation <br />Measure 8g - Adopt a more stringent water waste ordinance <br />Measure 8k - Enact mandatory lawn watering restrictions <br />9-1ncentives, including rebates <br />Measure 9a - Offer water-saving devices to residents, cost-shared <br />Measure 9b - Offer rebates for replacing existing toilets with 1.6 gallonslflush (gpf) <br />toilets <br />Measure 9d - Bring about more water-conserving residential landscaping <br /> <br />Implementation <br /> <br />I The conservation measures included in this final plan will be implemented between <br />1997 and 2001. A detailed implementation plan for each measure will be included in <br />an annual workplan each year. The workplan will include goals for the coming year, a <br />! plan for implementing the measures and an evaluation of accomplishments from the <br />previous year. As a part of the implementation plan, a detailed .cost-te-benefit" <br />analysis should be conducted. Any measure that costs more to implement than <br />I benefits received should not be implemented. The first workplan will be for 1997. <br /> <br />_ _ _ _ _ _ _ _ - - - rtle-implemeRtation-plan for -eaGh-mea5tlfe-wilHneltlde the caleyOI ies below: - - - - - <br /> <br />I DESCRIPTION A summary of tasks involved for achieving the measure <br />TARGET Which customers or end uses are addressed <br />TIME FRAME Dates for implementation and duration <br />I STAFF City staff responSible for implementation <br />COST Projected implementation costs <br />SAVINGS Projected water savings, and other benefits <br /> <br />I <br />I <br />I <br />I <br /> <br />Page43 <br />