My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Broomfield 1996 WCPlan
CWCB
>
Water Conservation
>
Backfile
>
Broomfield 1996 WCPlan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2011 3:42:20 PM
Creation date
9/30/2006 9:03:21 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Water Conservation Plan
Project Name
City and County of Broomfield Water Conservation Plan
Title
Water Conservation Plan
Date
3/1/1996
County
Broomfield
Water Conservation - Doc Type
Complete Plan
Document Relationships
Broomfield 1996 WCPlan Approval Ltr
(Message)
Path:
\Water Conservation\Backfile
Broomfield 1996 WCPlan Implementation Plan
(Attachment)
Path:
\Water Conservation\Backfile
Broomfield 1996 WCPlan Proof of Notice
(Message)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The scope of the Reuse Project includes building a pipeline to carry <br />secondary-treated effluent from the Wastewater Treatment Plant to Great <br />Western Reservoir for storage prior to treatment and irrigation reuse, The <br />existing potable water treatment plant would be modified for tertiary <br />treatment to achieve water quality standards consistent with those <br />specified in the Colorado Reuse Guidelines, Initially, Broomfield will <br />deliver reuse water to irrigate a new golf course which is under <br />construction at Interlocken Business Park. Reuse will ultimately be <br />expanded to include City parks, open space, and other property. Using <br />Great Western Reservoir as the storage component of the reuse project <br />optimizes the utilization of wastewater effluent. Initially there will be <br />between 1,100 and 1,400 acre feet of effluent available for reuse. The <br />400 acre feet of Coal Creek water and 300 acre feet of Walnut Creek <br />water may also be available to add to the reuse supply, This water will be <br />stored in Great Western Reservoir, The effluent will contribute to the <br />water supply in the reservoir after the drinking water replacement program <br />is completed and the Church Ditch water is sold, Every acre foot of <br />reuse water supplied for irrigation will reduce an acre foot of demand on <br />the potable water system, This will significantly reduce the seasonal peak <br />day demand on the potable water system. The water saved will be used <br />to support growth until 2020, deferring the need to purchase additional <br />water rights, <br /> <br />5, Distribution system leak repair: <br /> <br />The Utilities Division has an annual leak detection program to survey <br />portions of the distribution system for leaks, The survey is carried out <br />with the use of a leak noise correlator. The instrument is attached to a full <br />pipeline and can pick up continuous noise if a leak is present. The <br />survey helps to identify problem areas to be included in the annual water <br />line replacement program. The water line replacement program is <br />ongoing with a budget of approximately $300,0001 year. <br /> <br />The Utility Billing Division has an ongoing meter replacement program <br />with a $21,000 budget to replace old or leaking meters (approximately <br />400/year). <br /> <br />The city has performed systemwide water audits annually since 1989, <br />The audit identifies the metered consumption and known losses and <br />subtracts them from the production volume to arrive at an unaccounted for <br />water loss, The unnaccounted for water loss for the last five years <br />averaged 3.8%. The industry standard for acceptable unaccounted for <br />water loss is 0-5%, <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.