My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Castle Rock 1996 WCPlan
CWCB
>
Water Conservation
>
Backfile
>
Castle Rock 1996 WCPlan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2011 4:09:42 PM
Creation date
9/30/2006 9:02:57 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Water Conservation Plan
Project Name
Town of Castle Rock Water Conservation Plan
Title
Town of Castle Rock Water Conservation Plan
Date
7/9/1996
County
Douglas
Water Conservation - Doc Type
Complete Plan
Document Relationships
Castle Rock 1996 WCPlan Approval Ltr
(Message)
Path:
\Water Conservation\Backfile
Castle Rock 1996 WCPlan Implmtn Plan
(Message)
Path:
\Water Conservation\Backfile
Castle Rock 1996 WCPlan Proof of Notice
(Message)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />) <br /> <br />Table 5-1 <br />Town of Castle Rock <br />Annual Water Conservation Work Plan <br /> <br />I Measure I Start Date I End Date IPnposedfRI>L IodCostsI <br /> Water Efficient Fixtures <br /> Update Codes where applicable On going On going $0' <br /> Evaluate BAT code upgrades 5/96 On going $0' <br /> "TBE" tracking On going On going $0' <br /> Landscapes & Irrigation <br /> Service Center Xeriscape Alternatives. 4/96 6/96 $0' <br /> Xeriscape Alternatives - All Town' 4/96 On going Case By Case Review <br /> "TBE" tracking On going On going $0' <br /> Xeriscape Method Development-All Town 4/96 12/96 $0' <br /> Implement Incentive Credit Plan' 5/96 12/96 $3,000' <br /> Industrial/Commercial Water Use Processes <br /> Analyze current account structure 5/96 12/96 $0' <br /> Water Reuse Systems <br /> Feasibility Study for use on public irrigated areas & streetscapes 5/96 12/96 $0' <br /> Track other purveyor activities On going On going $0' <br /> Reuse Master Plan as part of Water Resource Plan 1/96 1997 -$1,000 <br /> Distribution System Leak Repair <br /> Develop method for home water audits' 5/96 On going $0' <br /> Continue detection and repair' On going On going $10,000'(96) <br /> Dissemination of Information <br /> Interior retrofit seminars' 5/96 12/96 $500 <br /> Water conservation organization participation' 5/96 On going $100/ <br /> Landscape seminars 5/96 10/96 $1,000 <br /> Water conservation flier mailing 6/96 9/96 $2,500 <br /> Water newsletter (2 issues)' 2/96 12/96 $1,800 <br /> Conservation kits-continue give away (consider town-wide) On going On going $50-2,500 <br /> Promotion of presentations 5/96 On going $100/ <br /> Cooperative efforts on essay, art contests 5/96 On going $200/ <br /> Xeriscape Plant Guide sale 4/96 - On going $2,000 <br /> National Drinking Water Week promotion 1/96 5/96 $800 <br /> Table place cards 4/96 9/96 $500 <br /> Water /Wastewater Rate Structures <br /> Consider lowering rates, through rebate methodology 5/96 12/96 $0' <br /> Regulatory Measures <br /> Enforce current building & plumbing code requirements 1/96 On going $0' <br /> Modification of current codes to address inconsistencies' 4/96 On going $0' <br /> Regulation enforcement of other applicable codes 4/96 On going $0' (review) <br /> Other Water Management Activities <br /> Evaluate benefits of current and new measures' On going On going Case by Case <br /> Aquifer recharge investigations On going On going Case by Case <br /> Implement Water Facilities Plan' 1/96 On going See capital <br /> Upgrade SCADA' 1/96 On going $50,OOO-60,OOO/yr' <br /> BAT for well drilling On going On going Case by Case <br /> Review other purveyor water conservation measures 1/96 On going $0' <br /> Funding monitoring 5/96 On going $0' <br /> Investigate tapping into computer accessed information 4/96 12/96 $500/yr <br /> Additional Part-Full Time Personnel' ASAP On going $15,000-30,000 <br /> " <br /> <br />1. Although these measures are denoted Wlth $0 cost, It would require at least Yi - 1 full time position to collectIVely fulfill these dutIes. <br />2. These items are currently budgeted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.