Laserfiche WebLink
<br />H~droLogic Technolog~ Fax:3D3-688-8698 <br /> <br />JLln 18 '99 <br /> <br />7:23 <br /> <br />P.DS <br /> <br />to meet approximately 78% of the average annual design demand with the balance of the water <br />demand met by Denver basin aquifer water. <br /> <br />Analysis of a downsized storage system indicates that the average annual yield of the project is <br />decreased by 17% when the total storage capacity of the project is decreased to the anticipated <br />configuration of the project. As shown on Figure 2, a decrease in the total storage capacity to <br />289 acre.feet decreases the yield by approximately 38 acre-feet to an average of 191 acre-feet <br />per year. <br /> <br />J 4.0 <br />rI:! <br />.... 3.S <br />o <br />~ 3.0 <br />~ 2.5 <br />",,2.0 <br />:sa <br />.2 1.5 <br />>< <br />11.0 <br />60,s <br />20.0 <br />.s 0 <br /> <br />WABASH RESERVOIR COMPLEX <br />YIELD I CAPACITY ANALYSIS <br /> <br />. -;t-cf?t~f=tl~~~:~f-~l~ <br /> <br />.-\.-- -- -. -1----1 ----'."1----1--,!-.-+--.- <br /> <br />;:~~l-r~f~~~;~-:.J- <br /> <br />100 <br /> <br />200 300 <br />Storage Capacity CAF) <br /> <br />400 <br /> <br />500 <br /> <br />Analysis of the <br />incremental yield of each <br />acre- foot of storage <br />capacity in the Wabash <br />Complex shows that the <br />yield of the project is <br />approximately 0.95 acre- <br />foot per acre-foot if <br />storage when total project <br />storage equals 50 acre. <br />feet. Incremental yields <br />of the project decline <br />significantly above 165 <br />acre-feet of total stage <br />capacity. <br /> <br />Increases to the total <br />storage capacity above <br />Figure 3. IncremeDtal Yield Curve 400 acre-feet result in a <br />negligible increase in the <br />average annual yield. At a total storage capacity of 800 acre-feet, the average annual yield <br />increases by only 12 acre-feet per year. In other words, a doubling of total storage capacity <br />provides little increase in the supply of water available from the project. <br /> <br />The major finding of this project is that the yield of the Wabash Complex is not significantly <br />. increased when the storage capacity of the project is increased above the 419 acre-foot decreed <br />capacity. A decrease in constructed storage capacity to between 165 acre-feet and 289 acre-feet <br />can effectively meet project design supply requirements while reducing the cost of the project. <br /> <br />-4- <br />