My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Silt Can Save Education Contract
CWCB
>
Water Conservation
>
Backfile
>
Silt Can Save Education Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2011 4:21:01 PM
Creation date
9/30/2006 9:02:05 PM
Metadata
Fields
Template:
Water Conservation
Project Type
Ag/Muni Grant
Contract/PO #
C153615
Applicant
Town of Silt
Project Name
Silt Can Save Water Conservation Education Project
Title
Contract
Date
6/22/1992
County
San Miguel
Water Conservation - Doc Type
Contract
Document Relationships
Silt Can Save Education Application
(Message)
Path:
\Water Conservation\Backfile
Silt Can Save Education Approval Ltr
(Message)
Path:
\Water Conservation\Backfile
Silt Can Save Education Final Report
(Message)
Path:
\Water Conservation\Backfile
Silt Can Save Education Invoice
(Message)
Path:
\Water Conservation\Backfile
Silt Can Save Education Workplan
(Attachment)
Path:
\Water Conservation\Backfile
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />EXHlBIT A <br /> <br />4. Project Fundim< ScbcduIe <br /> <br />8. GRANT Agreement: <br /> <br />I. <br /> <br />$5,729.00 <br /> <br />Initial grant payment to be made within thirty (30) days of the <br />date of execution of this contract by the State Controller or <br />his designee. <br /> <br />II. <br /> <br />$8,594.00 <br /> <br />In one interim payment reimbursing the Contractor for actual <br />expenditures made in the performance of this Contract. <br />Payment will be based upon properly documented financial <br />and narrative status reports detailing expenditures made to <br />date. Payment shaIl be distributed by October 30, 1m. <br /> <br />ill. <br /> <br />$1,592.00 <br /> <br />Final payment to be made only upon acceptance oC Project <br />completion and Fmal Report. The Contractor will submit a <br />final financial statement documenting the expenditure of all <br />Grant funds for which payment has been requested and a final <br />narrative report on the Project implementation and findings. <br /> <br />TOTAL <br /> <br />$15,915.00 <br /> <br />All requests for payment after the first payment will be initiated by the Contractor in accordance with the provisions in <br />Paragraph 6 of the main body of this Contract. <br /> <br />5. ContJact Monit0rin2 <br /> <br />The Department of Natural Resources, Colorado Water Conservation Board, will monitor the Project on an as.. <br />needed basis. <br /> <br />6. _ Scbedule <br /> <br />The Contractor will submit fInancial and narrative status reports detailing Project progress and properly <br />documenting all to-date expenditures of Grant funds at the time each payment request is made, in accordance with <br />the payment schedule. <br /> <br />Page 2 of 2 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.