My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DenverWater_PureWaterDemo_ApprvlLtr
CWCB
>
Water Efficiency Grants
>
Day Forward
>
DenverWater_PureWaterDemo_ApprvlLtr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2018 12:20:44 PM
Creation date
5/30/2018 2:53:05 PM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Implementation Grant
Contract/PO #
POGG1 2018-671
Applicant
Denver Water
Project Name
Pure Water Colorado Reuse Demonstration Project
Title
Approval Letter
Date
1/10/2018
County
Denver
Water Efficiency - Doc Type
Approval Letter
Document Relationships
DenverWater_PureWaterDemo_50%PR
(Message)
Path:
\Water Efficiency Grants\Day Forward
DenverWater_PureWaterDemo_75%PR
(Message)
Path:
\Water Efficiency Grants\Day Forward
DenverWater_PureWaterDemo_Applic
(Message)
Path:
\Water Efficiency Grants\Day Forward
DenverWater_PureWaterDemo_FinalReport
(Message)
Path:
\Water Efficiency Grants\Day Forward
DenverWater_PureWaterDemo_Invoice
(Message)
Path:
\Water Efficiency Grants\Day Forward
DenverWater_PureWaterDemo_PO
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Name of Applicant: Denver Water <br /> Date Received: 12/27/2017 <br /> Grant Amount: $48,000 <br /> HB 05-1254: Evaluation Checklist for Entities <br /> For Applicants: Yes No Comments: <br /> Is the applicant a covered entity? x <br /> Does the applicant have a state approved water conservation plan in x <br /> accordance with statutory revision 37-60-126? (HB 04-1365)? <br /> If the applicant is a covered entity, have they fully complied with HB1051 x <br /> requirements? <br /> Did the applicant provide a written statement from the entity's governing <br /> board, stating the entity's commitment to the project and the entity's x Pg 8 <br /> commitment to implementing long-term water saving measures and programs <br /> (w/authorized signature)? <br /> Did the applicant provide a cover letter with the entity's: name, contact <br /> information, and a signature of an individual with the authority to commit the x <br /> resources of the entity? <br /> Did the applicant provide a list of people and/or organizations that will be <br /> involved in assisting with the grant project (list of who will be utilizing the grant <br /> money)? <br /> Characterizing Water System: <br /> Did the entity provide their annual retail water demand (Metered Water Use) x Pg 4 <br /> for the past five years(in acre ft. or million gallons)? <br /> Did the entity identify their retail water delivery(Distributed Water)for each of x <br /> the past five years (in acre feet or million gallons)? <br /> (Not required, but preferred), Did the applicant provide information <br /> characterizing past water use by sector, (e.g. residential, commercial, and x Pg 4 <br /> industrial) and the source (e.g. surface water,groundwater, etc). <br /> Did the entity provide current (and if available past)per capita water use for x Pg 5 <br /> the last five years and the basis for this calculation? <br /> Did the entity provide their past, current, and predicted future population x Growing 1% <br /> served by the entity, (and the source of this information)? annually <br /> Did the entity state the water savings that was accomplished in the past five x Pg 6 <br /> years through water conservation efforts? <br /> Did the entity state water savings goals to be achieved through the x <br /> implementation of the "project"? <br /> Adequacy, Stability, and reliability of the entity's water system x Pg 7 <br /> *to be measured and examined by staff through analysis <br /> Description of Project: <br /> Did the applicant write a paragraph stating the purpose and the primary x <br /> features of the project? <br /> Did the applicant provide a detailed Scope of Work(tasks to be performed <br /> with grant monies stating how grant money will be used to achieve project x <br /> goals)? <br /> Did the applicant provide a "project"timeline, stating milestones with dates <br /> and end products with dates; also state the estimated dates when progress x <br /> reports will be submitted to CWCB staff(50%& 75%completion)? <br />
The URL can be used to link to this page
Your browser does not support the video tag.