Laserfiche WebLink
Table 15-Infrastructure Cost Estimate—Cache la Poudre River Diversion <br /> ItemNo. Description Estimated Quantity Unit Unit Price Cost <br /> ✓ r <br /> 1 Furnish and Install 36Inch PVC Pipe 1,550 LFO $25 $310,000 <br /> ✓ r 2 Furnish and Install 24Inch PVC Pipe 2,300 LFO $16,000 $345,000 1 <br /> ✓ 3 Check,Diversion,and Flow Measurement Structure 1 EA ► r 150 \ $120,000 <br /> ✓ 4 Pump Station No.1 (10 CFS)I 68 HPD r $2,657 $180,676 <br /> ✓ 5 Pump Station No.2(20 CFS)1 76 HPO ►$75,000 $201,932 <br /> ✓ 6 Miscellaneous Site Work2 1 LSO ► $20/ $50,000 <br /> ✓ 7 Access Road 4300 LF ► $ 01 00 $86,000 <br /> ✓ ► <br /> 8 Dewatering❑ 80 Days $45,000 $80,000 <br /> 9 Outlet Flow Measurement Structure 1 EA $45,000 <br /> Total $1,418,608 <br /> Mobilization 5% $70,930 <br /> Engineering(Designand Construction Observation)4 12% $170,233 <br /> Permitting 5 15% $212,791 <br /> Contingency $283,722 <br /> 9 Y 20% <br /> Total $2,156,284 <br /> Notes: <br /> 1 Raw water pump station assuming 60% pump efficiency and does not include the cost of electrical service <br /> to the pump station. <br /> 2 Miscellaneous site work includes re vegetation, final grading, and miscellaneous riprap. <br /> 3 Access Roads: $20/LF for moderate terrain and includes clearing, grubbing, grading, and road base. <br /> 4 Increased engineering percentage to cover addition floodplain modeling for the check <br /> structure being located in the Cache la Poudre River <br /> 5 Increased permitting percentage for addition permitting for work within the normal high <br /> water line of the river. Percentage could increase to 20% depending on the mitigation requirements. <br />