My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-057 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
7001-8000
>
CT2015-057 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 9:40:18 AM
Creation date
3/28/2018 9:40:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-057
C150366
Contractor Name
Town of Windsor
Contract Type
Loan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The infrastructure cost estimate for "Alternative No. 1 (Greeley No. 2 Canal Delivery)" is <br /> $1,345,131. <br /> Table 14-Infrastructure Cost Estimate—Greeley No.2 Canal Delivery / )t: <br /> ItemNo. Description Estimated Quantity Unit Unit Pr/$150,000 Cost <br /> • 1 Replace and Enlarge Existing Ditch 6,000 LF $25 <br /> • 2 Replace Headgateat Greeley No.2 Ditch 1 EA *000 $16,000 <br /> • 3 Furnish and Install 24 Inch PVC Pipe 2,300 LF $150 $345,000 <br /> ✓ r <br /> 4 Pump Station(10 CFS)1 68 HP $2,657 $180,676 <br /> r <br /> 5 Miscellaneous Site Work 2 <br /> 1 LS $75,000 $75,000 <br /> • 6 Access Road 3 4,300 LF $20 $86,000 <br /> • 7 Dewatering 30 Days $1,000 $30,000 <br /> • 8 Outlet Flow Measurement Structure 1 LS $45,000 $45,000 <br /> Total $927,676 <br /> Mobilization P 5% $46,384 <br /> Engineering(Designand Construction Observation) • 10% $92,768 <br /> Permitting • 10% $92,768 <br /> Contingency • 20% $185,535 <br /> Total $1,345,131 <br /> Notes: <br /> 1 Raw water pump station assuming 60% pump efficiency and does not include the cost of electrical service <br /> to the pump station. <br /> 2 Miscellaneous site work includes re vegetation,final grading, and miscellaneous riprap. <br /> 3 Access Roads: $20/LF for moderate,terrain and includes clearing, grubbing,grading, and road base. <br /> The cost estimate for "Alternative No. 2 (Cache la Poudre River Pump Station) is <br /> $2,156,284. However, there are some overlapping costs between Alternative No. 1 and <br /> No. 2. Table 16 is a combination of Alternatives No. 1 and No. 2 with a reduction for <br /> these overlapping costs. Table 16 itemizes the total infrastructure cost ($2,515,004) <br /> presented in the final cost listed in Table 13. <br />
The URL can be used to link to this page
Your browser does not support the video tag.