My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
South Platte - Greeley-CacheLaPoudreGreenway_Final Report
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
South Platte - Greeley-CacheLaPoudreGreenway_Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2017 7:56:45 AM
Creation date
6/13/2017 7:56:37 AM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
South Platte
Applicant
City of Greeley
Description
Greeley Area Cache La Poudre Greenway Corridor Project
Account Source
Basin & Statewide
Board Meeting Date
3/16/2016
Contract/PO #
POGG1 2016-798
WSRA - Doc Type
Final Deliverable Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Corridor Master Plan"would encompass the Greeley/Windsor Reach of the river and align existing <br /> studies,guides and plans into a single corridor and water activity planning tool. <br /> With the requested funding from the WSRA and the local match,Greeley staff developed a Request <br /> for Qualifications to solicit consultant proposals. Three consultants were interviewed by the Team <br /> and the firm ERO selected. <br /> PROJECT STAGES AND OUTCOMES <br /> The physical Poudre Greenway Corridor was confirmed and mapped with distinct reaches of the river <br /> individually categorized. Within that project boundary work was divided into three key tasks; <br /> outcomes from each portion of the project are summarized at the end of each task. Project <br /> deliverables and products are provided separately(DVD and via web link). <br /> TASK 1—INVENTORY <br /> Description of Task <br /> Inventory all relevant Cache la Poudre—related plans,studies, and projects <br /> Deliverable <br /> Collection of documents,source and date of material, purpose of document,summary <br /> of material and reach of river it pertained to. <br /> OUTCOMES: 160*reports,studies and documents were identified, collected, reviewed, <br /> categorized, mapped, and summarized using a common nomenclature for ease of <br /> reference and retrieval. <br /> *95 reports from Greeley,28 from Windsor,33 of Regional scope, and 4 originating <br /> from Weld County. <br /> TASK 2—MATRIX/DASHBOARD <br /> Description of Task <br /> Develop a master matrix/dashboard of the plans,studies&projects <br /> Deliverable <br /> Completed matrix/dashboard depicting Cache la Poudre work products, interface <br /> components,goals and objectives,and schedule of action steps by work area. <br /> OUTCOMES: <br /> ERO and Project Team meets with City of Greeley IT staff to discuss how to capture, map <br /> and share the info collected from Task I into a pubiically accessible system that can be <br /> sorted, grouped, mapped and shared. Ultimately, the information is collected for <br /> permanent archiving and retrieval in the City of Greeley laser fiche system and the <br /> corridor map is posted and maintained on the Greeley's website. The Greenway Corridor <br /> map displays each reach of the river with icons that allow the user to view all documents <br /> in the inventory that relate to that geographic stretch. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.