My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2018-892 Feasibilty Study
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2018-892 Feasibilty Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 12:21:10 PM
Creation date
3/24/2017 2:49:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2018-892
Contractor Name
Town of Wiggins
Contract Type
Loan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Detailed Man <br /> i <br /> ' <br /> a <br /> Giassey <br /> 20 Propozed Surface <br /> Irrigation Well <br /> Water Easenient <br /> ad <br /> T South Side ' <br /> + ' Canal `-_ �_ ' -* =MRM <br /> Deli very point <br /> Project Alternatives <br /> Allernalive 1 - The "No Action"alter-native <br /> This alternative entails leaving the water system as it currently is, and not make any improvements <br /> to the treatment capabilities or operations. Although the 'Town is currently able to provide safe and <br /> adequate drinking water to their customers,the town does so with leased augmentation water that is <br /> not a reliable long term source. <br /> Alternative 2--Continua to Lease Water <br /> C'olorado has experience several years ofabove average rain,which has driven the cost of the leased <br /> augmentation water down. However, historical data shows dramatic increase in augmentation water <br /> prices during dryer seasons. The Town has no guarantee during a drought that it can purchase <br /> augmentation water or find it at reasonable price. <br /> Page 8 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.