Laserfiche WebLink
D N R COLORADO 1313 Sherman Street John Hickenlooper, Governor <br /> Colorado Water Denver, CO 80203 <br /> CO <br /> Robert Randall, DNR Executive Director <br /> Conservation Board P (303)866-3441 <br /> Department of Natural Resources F(303) 866-4474 James Eklund, CWCB Director <br /> TO: Colorado Water Conservation Board Members <br /> FROM: Kirk Russell, P.E., Finance Section Chief 114+1` <br /> DATE: November 16-17, 2016 Board Meeting (Updated November 17, 2016) <br /> AGENDA ITEM: 9d. 2017 Projects Bill <br /> Large Water Project Financing Authorization <br /> (2) Rio Grande Cooperative Project - Funding Increase <br /> Introduction <br /> In November of 2011, the CWCB Board recommended approval of a funding package of $30 million for <br /> the Rio Grande Cooperative Project. This was subsequently placed in the CWCB Projects Bill SB12-165 <br /> and was signed by the Governor in 2012. The authorization included a loan for $10 million for the <br /> improvements needed to the Beaver Park Reservoir, owned and operated by Colorado Parks and <br /> Wildlife and was completed in 2015. In addition, a $5 million grant was awarded to the San Luis Valley <br /> Irrigation District (District) to prepare final design plans for repairs needed at the Rio Grande Reservoir <br /> and to fund the seepage control improvements. The authorization also included a $15 million loan- <br /> grant for the repair of the outlet tunnel and spillway. <br /> The District recently received approval of final design by the State Dam Safety Branch for the repairs. <br /> This resulted in an increase in the engineer's estimate of total project cost. The District is requesting <br /> an increase from the current $15 million loan-grant authorization to $25 million in loan-grant <br /> authorization. <br /> Staff Recommendation (Board approved Staff Recommendation on November 16, 2016) <br /> Staff recommends the Board request the General Assembly to authorize an additional $10 million for a <br /> total of $40 million funding package for the Rio Grande Cooperative Project. This increase will be <br /> reflected in the 2017 CWCB Projects Bill as a $25 million loan-grant funding package to the San Luis <br /> Valley Irrigation District's Rio Grande Reservoir Rehabilitation Project. <br /> OF"Colo <br /> Interstate Compact Compliance •Watershed Protection • Flood Planning a Mitigation • Stream a Lake Protection <br /> Water Project Loans a Grants • Water Modeling • Conservation a Drought Planning • Water Supply Planning * *' <br /> .1876«' <br />