My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rio Grande Cooperative Project Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
Rio Grande Cooperative Project Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2016 10:43:28 AM
Creation date
11/22/2016 10:43:27 AM
Metadata
Fields
Template:
Loan Projects
Contractor Name
San Luis Valley Irrigation District
Contract Type
Loan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
* DNR COLORADO Rio Grande Cooperative Project <br /> co '9) Colorado Water San Luis Valley Irrigation District <br /> Conservation Board <br /> November 2016 Board Meeting <br /> (Increase) <br /> LOAN DETAILS Ili - <br /> Project Cost: $40,000,000hi '`~ <br /> Loan/Grant Package: $10m CPW $30m SLVID 6 � ' <br /> Loan Term and Interest Rate: TBD <br /> Funding Source: Severance Tax PBF transfer to Const Fund 54,,,,,,„, I <br /> BORROWER TYPE ''� / <br /> Municipal !� a4 .14.- <br /> k• <br /> PROJECT4 1 4\1 1 6 ip.. <br /> DETAILS <br /> Project Type: Reservoir Rehabilitation i 3 <br /> 1r,7Recovered Storage: 10,000AF Rio Grande 22,01AF Beaver Park ` -' r',►:: <br /> I J2 r(r <br /> In November of 2011, the CWCB Board recommended <br /> LOC A T ION <br /> approval of a funding package of $30 million for the Rio County: Hinsdale, Rio Grande <br /> Grande Cooperative Project. This was subsequently Water Source: Beaver Creek et Rio Grande <br /> placed in the CWCB Projects Bill SB12-165 and was signed Drainage Basin: Rio Grande <br /> by the Governor in 2012. The authorization included a Division: 3 District: 20 <br /> loan for $10 million for the improvements needed to the <br /> Beaver Park Reservoir, owned and operated by Colorado Parks and Wildlife and was completed in 2015. <br /> In addition, a $5 million grant was awarded to the San Luis Valley Irrigation District (District) to <br /> prepare final design plans for repairs needed at the Rio Grande Reservoir and to fund the seepage <br /> control improvements. The authorization also included a $15 million loan-grant for the repair of the <br /> outlet tunnel and spillway. <br /> The District recently received approval of final design by the State Dam Safety Branch for the repairs. <br /> This resulted in an increase in the engineer's estimate of total project cost. The District is requesting <br /> an increase from the current $15 million loan-grant authorization to $25 million in loan-grant <br /> authorization. <br /> Rio Grande Reservoir Beaver Park Reservoir r , <br /> 40,,,,,t,,'.',17 M <br /> • <br /> '` rx r <br /> 2r / <br /> ✓J <br /> , _r,, `'',, ,h ,s 9 I...?'Rio Grande Reservoir.,. <br /> FrItti ,e • <br /> t i44L <br /> g 4 +dr, va <br /> , ` os, . , ' '-- - u ) <br /> '11/ , - ? ';�°' � South Fork) Del Norte <br /> ti <br /> 'syqBeaver Park Reservoir fit 104 <br /> Monte Vista) <br /> .. Ilia or-A.44 1 lir a // ` <br /> 1I <br /> Water Project Loan Program - Project Data Sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.