further guidance for the State and design considerations.No major obligations take place in FY-14. Mark <br /> Wernke <br /> Paonia Reservoir—Paonia Project(CRSP Participating)— Sedimentation study to develop alternatives to <br /> maintain or prolong reservoir capacity. WCAO has entered into a Service Agreement with the TSC for a <br /> $212,000 scope of work. Work includes sediment surveys, sampling, upstream and downstream evaluations, <br /> and development various alternatives. USGS has installed automatic sediment samplers. TSC has completed <br /> river survey below Paonia Reservoir. Bathymetric survey of entire reservoir completed week of June 10th. TSC <br /> crunching numbers, will develop a new Area Capacity Table. Work is in progress. May need additional <br /> funding to pay for USGS sediment monitoring. TSC has spent$116K to 8-1-13. Received draft Data <br /> Collection Technical Memorandum on Paonia Reservoir, Muddy Creek, and North Fork on January 14, <br /> 2014. A conference call was held on March 11,2014 with Kent Collins TSC, Cory Williams USGS. The <br /> data collection report should be final this week and the one-dimensional sedimentation transport model <br /> should commence the week of March 17th. Tom Fowlds, TSC-Kent Collins. <br /> 2014 Proposals <br /> Animas La Plata Gaging Station—ALP (CRSP Participating)—WCAO has completed preliminary design work <br /> pursuant to previous ALP commitments. Work to be completed by Weminuche Construction Authority under a <br /> contract modification. Tyler working with State, Tribe and District. Mod to 638 Contract. Modification <br /> executed,pre-construction meeting scheduled for June 2, 2014,work to proceed(and likely completed) in June. <br /> Received easement modification by Tribe to allow additional access and equipment within existing easement <br /> Working on agreement with State to O&M the instrument. Received executed agreement with La Plata County <br /> to allow work and permanent installations in their culvert. Tyler Artichoker <br /> Pleasant View/Ruin Canyon Pumping Plants—Dolores Project(CRSP Participating)—Continuation of pumping <br /> plant replacements on Dolores Project. Work continues on spec development. Obligations possible in FY-14 <br /> Mark Wernke and Vern Harrell <br /> Silt Pumping Plant—Silt Project(CRSP Participating)—Replacement of pumps used to raise water from <br /> Colorado River to supplemental water project lands. Project to include other water efficiency improvements. <br /> XCEL Energy plans to upgrade power transmission line to a higher voltage sometime between 2015 and 2017. <br /> This will require a new transformer. Need to start planning and design soon in order to allow lead time <br /> necessary for procurement etc. WCAO and Silt have installed a stage sensor to gather design data on the Pump <br /> Canal. WCAO will continue to perform physical discharge measurements in order to rate the section. TSC is <br /> converting scanned design documents to AutoCad to be used for design work after the design data has been <br /> gathered. Working with WAPA,Xcel, and Silt to get Tap Line upgraded or change to distribution rate power. <br /> Service Agreement in place with TSC for preliminary work to scope pumping alternatives. Should receive <br /> pump conceptual alternatives by January 10,2014. Bob Norman and TSC rep, Jerry Waugh to attend Silt <br /> Board meeting on January 15, 2014 to discuss alternatives. Bob Norman received Project Management Plan <br /> (PMP) from Robert Zelenka TSC on February 14,2014. Total PMP budget showed $635,505.Bob <br /> Norman traveled to Denver TSC for February 27th meeting to discuss cost of the project. Bob Norman <br /> and Josh Dunham <br /> 2015 Proposals <br /> A-LP Mussel Inspection and Decontamination—Power Office gave approval via email to accelerate this FY15 <br /> funding to immediately begin the design work. AutoCAD drawings of the City of Durango's concept for entry <br /> station were received and routed to Environmental Planning group for initial cultural resources assessment, and <br /> to Lands group for initiation of design. . Service Agreement with Regional Office Design Group was signed; <br /> area will be surveyed week of June 2 and survey data provided to Regional Office by June 9. Schedule is to <br /> have a final design and specification package completed by end of August 2014. Major obligation for this work <br /> to begin 1st or 2" quarter FY 2015. Kathleen Ozga and Mark Chiarito <br />