Laserfiche WebLink
TABLE 1 <br /> RIO GRANDE RESERVOIR•SLOPE LINER AND CURTAIN <br /> MCMS,INC.BID PRICE FOR SUMMER 2013 WORK <br /> Item Description Quantity Unit Bid Unit Cost Total <br /> 7 Surveying(per scope of work request) 1 LS $ 18,000.00 $ 18,000.00 <br /> 8 Imported Granular Road Base 600 CY $ 60.00 $ 36,000.00 <br /> Total Estimated Cost $ 1,759,016.25 <br /> Additional Items <br /> 1 Relocate Bubbler 1 LS $ 7,570.00 <br /> 2 Hydraulic Rotary Cutter Test Work 1 LS $ 30,750.00 <br />