Laserfiche WebLink
TABLE 2 <br /> TOTAL ESTIMATED COSTS <br /> PHASE 1 CONSTRUCTION 2013 <br /> CLAY SLOPE LINER, CLAY BLANKET,AND GROUT CURTAIN <br /> Description Cost <br /> Mobilization $ 50,500 <br /> Clay Liner and Freeboard Dike $ 818,750 <br /> Mobilization/Demobilization for Grout Curtain $ 31,150 <br /> Grout Curtain (Hayward Baker) $ 592,411 <br /> Grout (MOMS) $ 53,175 <br /> Clay Blanket $ 49,960 <br /> Miscellaneous $ 109,070 <br /> Surveying $ 18,000 <br /> Imported Granular Road Base $ 36,000 <br /> MOMS Base Bid Subtotal $ 1,759,016 <br /> Construction Engineering $ 220,000 <br /> Install Inclinometer $ 40,000 <br /> Total Estimated Cost $ 2,019,016 <br /> Additional Grout Cost Contingency $ 395,000 <br /> Relocate Bubbler $ 7,570 <br /> Hydraulic Rotary Cutting Test Work $ 30,750 <br /> 5% Contingency on Clay Liner $ 40,000 <br /> Total Budget $ 473,320 <br /> TOTAL FUNDS TO REQUEST FROM STATE $ 2,492,336 <br />