Mr. Travis Smith <br /> April 16, 2013 <br /> Page 2 <br /> • Relocate Bubbler, $7,570: The bubbler used to measure reservoir water levels and <br /> transmit the data electronically must be relocated. This will be fully scoped during a site <br /> visit next week, but we have a placeholder cost of$7,570. <br /> • Hydraulic Rotary Cutter Test Work, $30,750: We may be able to draw the reservoir <br /> down so the tunnel intake can be inspected in the fall of 2013. This is necessary for <br /> Phase 2 outlet design. While it is accessible we would like to conduct a hydraulic rotary <br /> cutter test on the rock. If the tunnel rock can be efficiently cut with this tool, no blasting <br /> will be required under Phase 2 and costs will be reduced. A favorable test is likely to <br /> produce better Phase 2 bids. <br /> • Contingency on Clay Liner, $40,000: We have included approximately five percent <br /> contingency on this work. Unknown conditions revealed by foundation excavation may <br /> increase material quantities, so a$40,000 contingency beyond the base bid should be <br /> included in the budget. <br /> The total budget for the planned work in the summer and fall of 2013 is $2,492,336. Included <br /> within that number is $435,000 in contingency costs for additional quantities that could be <br /> required beyond the base bid. <br /> Please call with any questions or comments. <br /> Sincerely, <br /> DEERE & AULT CONSULTANTS, INC. <br /> on . Dee,,c- ,_. <br /> re, P.E. <br /> Principal <br /> DWD:sp <br /> Attachments <br /> Q:\0387 San Luis Valley Irrigation District\Phase I Construction Costs.Ltr Docx <br />