in the preferred plan unless a major problem is found as a result of this <br /> study. The second priority is Beaver Creek Dam site if Plateau is not <br /> feasible. If neither of those sites are found to be feasible, additional <br /> evaluations will be necessary to determine other suitable sites. The studies <br /> will include: topography of the Plateau and Beaver dam and reservoir sites; <br /> determination of the optimum reservoir size; preparation of appraisal <br /> designs and costs for both sites; evaluation of hydrology; and geotechnical <br /> field studies of the preferred dam site. <br /> 2.c.2. Small - . <br /> Upstream Storage SitesEvaluation =small [ ge sites <br /> (surface or alluvium) along the Dolores Nor u-str o'p McPhee <br /> Reservoir will be conducted toprovide a fi �. p <br /> �t+'�tter su,e,�.,Vi r plans of <br /> augmentation and/or exchange. The potential storage;Qptio ``'may include: <br /> subsurface alluvial sites in the Dolores ' r alluvium; R el pit reservoirs; <br /> raising the spillway at the existing Grou z'?z,a:8,Reserve r on a tributary to <br /> the West Fork of the Dolores River; inventafy'"Of o_ "" storage options <br /> 2.c.3. Dove Creek Canal Stor " ry Site Stor sites along the Dove Creek <br /> Canal (a facility of the Dolore ', jeet) are aided to provide water during <br /> periods the canal is not operated Cris."= ll capacity. These sites include, <br /> though not limited to, Sharps Cr`'` reservoir and Monument Creek <br /> reservoir. <br /> 2.c.4 Use of Existing Storage Sites — The potential to utilize all or portions <br /> of existing reservoirs will be evaluated. The existing reservoirs include: <br /> Totten, Groundhog, Narraguinnep, and McPhee. <br /> 2.d. Preliminary analysis of the Dolores Project facilities has shown that the Dove <br /> Creek Canal can carry water for an additional 4,100 acres through Reach 1, about <br /> 2,300 acres through Reach 2, and 1,100 acres through Reach 3. The available <br /> capacity of the canal to serve additional lands will be specifically determined. In <br /> order to utilize Dolores Project facilities, a carriage contract is necessary with the <br /> Bureau of Reclamation. <br /> The existing pumping plants to serve irrigated lands can potentially serve an <br /> additional 1,200 acres provided that distribution pipelines are constructed. In order <br /> to utilize this existing capacity, W E T PACK anticipates increased irrigation up to <br /> the capacity of the existing facilities. The extra capacity of the pump stations will <br /> be finally determined. <br /> The delivery pipelines and pumps necessary to convey the water from the Dove <br /> Creek canal to the potentially irrigated lands will be planned and sized with <br /> construction cost estimates. <br /> Page 5 12/30/98 F;jjohn\memo\WETPACK SCOPE OF WORK.doc <br />