My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150003 PIF Documents
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C150003 PIF Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 3:15:34 PM
Creation date
5/12/2016 3:12:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150003
Contractor Name
Dolores Water Conservancy District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DWCD intends to retain other specialized consultants for techni al work, such as: dam <br /> design, surveying, geotechnical drilling, environmental analysis/p-rmitting, and others as <br /> needed. DWCD will retain the services of consultants as neede. through "Request for <br /> Qualifications" process to select the most qualified professionals. <br /> � Va <br /> 644: • <br /> PRELIMINARY SCOPE OF WORK 1 . <br /> The study will be conducted in five steps: <br /> 1. Conduct scoping activities. The Reconnaissan , idy shall . 4 e starting point. <br /> 2. Evaluate water demands, water sources, st. age c n y components. <br /> . d delivery <br /> • <br /> The Reconnaissance Report will pro z, % ,-: asis' .1. t e eva!nations which will be <br /> expanded or changed if appropriate. Q4* $ ,• <br /> 3. Perform appraisal level analysis to formllpi d evaluate a number of preliminary <br /> alternatives for meeting the study objective. Reconnaissa ce-Report will provide <br /> the starting point for the analysis. There mayeveral iteratio s'ofalternatives. <br /> 4. Select the preferred alternative. r <br /> 5. Prepare a detailed feasibility level analysis of the preferred plan. <br /> 6. Prepare a final report in accordance with the "Guidelines f.r Financial Assistance <br /> through the Colorado Water Conservation Board Const ction- Fund" (CWCB <br /> Construction Fund Guidelines) to document the study process • d analysis. <br /> Coordination with CWCB staff and Board shall occur regularly t i ought =the feasibility <br /> study process. <br /> The work tasks described below are listed in the general order that-the:work will be <br /> accomplished. Preliminary evaluations have been prepared for early all-of the tasks, <br /> which are presented in the Reconnaissance Report; the feasibility s dy will=build upon the <br /> existing base of information. <br /> Step 1 — Scoping <br /> Using the Reconnaissance Report as the starting.point, evaluate the scope of the feasibility <br /> study. <br /> l.a. Review NEPA requirements and the CWCB Constructi.n Fund Guidelines as <br /> they may apply to W E T PACK <br /> Page 3 12/30/98 F;[johnlmemo1WETPACK SCOPE OF WORK.d.c <br />
The URL can be used to link to this page
Your browser does not support the video tag.