My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-904 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2017-904 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 8:25:16 AM
Creation date
3/24/2016 10:10:52 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-904
Contractor Name
Julesburg Irrigation District
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Permitting <br /> The Julesburg Irrigation District has easements for the Canal. We are exempt from 404 <br /> permitting, as this project is Irrigation Diversion and related structure. <br /> Intuitional Considerations <br /> Entities that are, or may be involved in the design, construction, and financing of the project <br /> include: <br /> Julesburg Irrigation District; financing and project management <br /> Draht Consulting; design <br /> Concrete Specialties; construction <br /> Colorado Water Conservation Board; financing <br /> The Julesburg Irrigation District will be the lead for financing design and construction of the <br /> project, and will be entering in to contracts with various entities for the services. <br /> Financial Analysis <br /> The Julesburg Irrigation District will enter into a financing agreement with the Colorado Water <br /> Conservation Board for a maximum of$197,000. The estimate of cost based upon a time and <br /> materials agreement with the Contractor. <br /> Credit Worthiness <br /> The Julesburg Irrigation District has 3 current loans with the Colorado Water Conservation <br /> Board listed below. <br /> Project Original Amount Balance <br /> Outlet Reconstruction Loan <br /> Inlet Reconstruction Loan <br /> Lodgepole Petersen Structure <br /> Alternative Financing <br /> Page 8 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.