My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-174 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2015-174 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 8:18:02 AM
Creation date
12/18/2015 9:55:35 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-174
Contractor Name
Uncompahgre Valley Water Users Association
Contract Type
Loan
County
Montrose
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
which approximately 70% reaches the Uncompahgre River for distribution throughout <br /> the entire UPA. There are six direct lateral water diversions off the South Canal serving <br /> 320 water users and irrigating 13,600 acres in the southeast part of the UPA. In addition, <br /> the South Canal provides 172 cfs to the West Canal. <br /> Technically speaking, the Gunnison Tunnel and South Canal function to move water <br /> from the Gunnison River to the Uncompahgre River for distribution throughout the entire <br /> Uncompahgre Project Area and provide half of the irrigation water supply needed. <br /> Credit Worthiness <br /> UVWUA has entered into a number of contracts with the U.S. government and other <br /> entities. Historical repayment contracts include: <br /> • <br /> Uncompahgre Valley Project Construction Contracts <br /> • U.S. Bureau of Reclamation/Uncompahgre Valley Water Users Association Repayment <br /> Contract,Symbol 11r-1530,dated December 13, 1948. <br /> Contract Symbol I1r-1530, aka the Government/Association Contract, replaces and <br /> supersedes ten previous repayment contracts. It describes the irrigation works of the <br /> Uncompahgre Valley Project, the repayment obligation, and the general description of <br /> the operation and maintenance obligations by both the UVWUA and the U.S. <br /> government. The UVWUA agreed to pay installment payments of$60,000 per year for <br /> the Gunnison Tunnel,the Project distribution system and the construction of Taylor Park <br /> Reservoir for the total construction cost of $10,150,000.00. This contract was <br /> subsequently reduced and adjusted for lands deemed non-irrigable. <br /> Rehabilitation and Betterment Contracts(R&B Contracts) <br /> • U.S. Bureau of Reclamation - Rehabilitation and Betterment, Uncompahgre Valley <br /> Project Contract No. 14-06-400-1067,June 20, 1960. <br /> • U.S. Bureau of Reclamation - Rehabilitation and Betterment, Uncompahgre Valley <br /> Project; Contract No. 14-06-400-4419, dated March 16, 1966, amended March 13, <br /> 1967 and May,27, 1970. <br /> 5 <br />