Laserfiche WebLink
• <br /> • <br /> X. Changes to the total funding needed on an approved project already in process should <br /> be discussed between the Reclamation POC and the State POC. <br /> XI. MOA funding is not interchangeable between projects. If the State determines that a <br /> project is being cancelled,or the scope will be significantly reduced,the State needs to <br /> notify Reclamation and the funding will be made available for future project proposals <br /> through the normal screening process. <br />