My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Staff Notes on CRSP MOA
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Staff Notes on CRSP MOA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 12:42:59 PM
Creation date
11/10/2015 1:35:13 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Staff Notes and related documents on CRSP MOA
State
CO
Basin
Statewide
Date
1/1/2015
Author
CWCB Staff
Title
Staff Notes on CRSP MOA
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROPOSED PROJECT JUSTIFICATION <br /> Item/Activity: Name of Project/Item <br /> State: Self explanatory <br /> Project Manager: Reclamation Project Manager <br /> State's Point of Contact: Self explanatory <br /> Federal Project or Program: What Reclamation work is this related to?? <br /> Legislative Authority: What authority(public law)do we have to do this work(if known) <br /> Ownership: Who owns the facility—Is this facility transferred works or owned by the United States? <br /> Origination Date: Original Date Justification was prepared <br /> Revision Date: Date and Short Description of Revision to Original(if this is a modification to <br /> the original proposal). <br /> Estimated Cost: Include contract,contract preparation,design, studies,NEPA,etc. <br /> Project Type: Replacement,Addition, Extraordinary Maintenance,Water Management <br /> Description of Item: One to several paragraphs describing the proposed activity and of adequate <br /> content. Provide enough detail so someone unfamiliar with the project can determine the project's scope <br /> of work. <br /> Proposed Schedule: Identify any critical schedule dates such as seasonal work, scheduled outages, <br /> recreation concerns,compliance reviews, etc. <br /> Condition: Explain in one or two paragraphs why the work is required. Explain why the work needs to <br /> be done when proposed. <br /> Cost Effectiveness: Was an economic analysis done? If so, identify results. <br /> Benefits: Enter the tangible benefits of the project affected by this work item(e.g.,cost estimates from <br /> recent economic studies). <br /> Alternatives Considered: Describe alternatives considered and results. <br /> Recommended Alternative: State recommended alternative. <br /> Impacts if Schedule Delayed: State possible consequences of not funding the proposed work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.