Laserfiche WebLink
Moltz Constructors,Inc. Page 11 <br /> CONTII Phase II Continental 10/23/2014 12:46 <br /> Direct Cost Report <br /> Activity Desc Quantity Unit Perm Constr Equip Sub- <br /> Resource Pcs Unit Cost Labor Materi Matl/Ex MentContrac Total <br /> BID ITEM= 37000 <br /> Description=Seeding&Reclamation Unit= AC Takeoff Quan: 1.680 Engr Quan: 1.680 <br /> Bid Date: Owner: Engineering Firm: <br /> Estimator-In-Charge: <br /> JOB NOTES <br /> Estimate created on: 02/17/2014 by User#: 0 - <br /> Source estimate used: C:\HEAVYBID\EST\ESTMAST <br /> ************Estimate created on: 06/28/2014 by User#: 0 - <br /> Source estimate used: C:\HEAVYBID\EST\SANTAMARIA <br /> *on units of MH indicate average labor unit cost was used rather than base rate. <br /> [ ]in the Unit Cost Column=Labor Unit Cost Without Labor Burdens <br /> In equipment resources, rent % and EOE % not = 100% are represented as XXX%YYY where <br /> XXX=Rent% and YYY=EOE% <br /> Calendar Codes <br /> 40 40 hrs/wk 5 x 8 <br /> 45 45 Hrs/wk 5 x 9 <br /> 50 50 hr/wk 5 x 10 <br /> 509 5-9's <br /> 54 54 hrs/wk 6 x 9 <br /> 60 60 hrs/wk 6 x 10 <br /> 609 6-9's <br /> 70 70hrs/wk7x 10 <br />