Laserfiche WebLink
Moltz Constructors,Inc. Page 10 <br /> CONTII Phase II Continental 10/23/2014 12:46 <br /> Direct Cost Report <br /> Activity Desc Quantity Unit Penn Constr Equip Sub- <br /> Resource Pcs Unit Cost Labor Materi Matl/Ex MentContrac Total <br /> BID ITEM = 36000 <br /> Description=Topsoil Placement Unit= CY Takeoff Quan: 1,320.000 Engr Quan: 1,320.000 <br /> 400:: Top oSi .a <br /> r an1. ,320.00 <br /> 402-10ED 10 CY End Dump Su 65.00 HR <br /> 8DZ6 D6, 11'Blade, 140 hp, 35.00 HR <br /> 8L250 Kom 250 Ldr-25k L 30.00 HR <br /> O ==>Operator 65.00 MH <br /> 0.0492 MH/CY 65.00 MH [ <br /> 0.0492 MH/Uni 20.3077 Unit/MH <br /> >Item Totals: 36000 - Topsoil Placement <br /> $0.00 0.0492 MH/CY 65.00 MH [ <br /> 0.000 1320 CY <br /> BID ITEM= 37000 <br /> Description= Seeding&Reclamation Unit= AC Takeoff Quan: 1.680 Engr Quan: 1.680 <br /> and, .. *00n an: 1.60 AC w : <br /> Reclamation of site will be done using blades and dozers to neatly restore the <br /> site. excess piles will be placed to owners request within reason and area will be <br /> seeded as required. Haul roads will be bladed and returned to pre construction <br /> conditions. <br /> 402-SEED Landscape and Seed 1.68 AC <br /> 8L140 Komatus 140 T-L-Ba 80.00 HR <br /> L ==>Laborer 80.00 MH <br /> O ==>Operator 80.00 MH <br /> 95.2380 MH/AC 160.00 MH [ <br /> 95.2381 MH/Uni 0.0105 Unit/MH <br /> >Item Totals: 37000 - Seeding&Reclamation <br /> $0.00 95.2380 MH/AC 160.00 MH [ <br /> 0.000 1.68 AC <br /> Report Notes: <br /> The estimate was prepared with TAKEOFF Quantities. <br /> This report shows TAKEOFF Quantities with the resources. <br /> "Unreviewed"Activities are marked. <br />