Laserfiche WebLink
r <br /> ( 3 ) Combining of major canals and ditches, and <br /> ( 4) Lining and combining of laterals . <br /> The measures upon which the Bureau of Reclamation has been <br /> focusing in its recent planning efforts, and the incremental <br /> cost-effectiveness of each measure, are itemized in the attached <br /> table. <br /> Major issues concern the acceptability to local interests of <br /> combining canals and laterals, integration of system operation in <br /> a manner acceptable to local interests, long-term 0, M, & R <br /> costs, and the level of cost-effectiveness to which the project <br /> should be carried. <br /> JWM/gl <br /> Enclosures: as stated <br /> LAMVy�•'.iii <br /> a :: <br /> SOW <br /> MEMORANDUM -2- 3/2/83 <br />