My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 09/08/1983
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
DayForward
>
2001-3000
>
Board Meeting 09/08/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2014 3:58:16 PM
Creation date
11/21/2014 3:58:11 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/8/1983
Description
Minutes, Agenda, Memorandums September 08,09, 1983
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX .E <br /> STATE OF COLORADO <br /> COLORADO WATER CONSERVATION BOARD <br /> Department of Natural Resources <br /> 823 State Centennial Building <br /> 1313 Sherman Street ^��%z <br /> Denver,Colorado 80203 <br /> Phone:(303)866-3441 <br /> M E M OR A N D U M Richard D.Lamm <br /> Governor <br /> J.William McDonald <br /> Director <br /> David W.Walker <br /> Deputy Director <br /> TO: Members, CWCB <br /> FROM: Bill McDonald l ti <br /> DATE: August 31, 1983 <br /> SUBJECT: Agenda Item 8b, September 8-9, 1983, Board Meeting -- <br /> Closed Basin Project, Status of Construction <br /> Introduction <br /> The Act authorizing the Closed Basin Project provides that <br /> construction of the project may be undertaken in stages only if <br /> construction of each successive stage after Stage 1 is consented <br /> to by the Colorado Water Conservation Board and the Rio Grande <br /> Water Conservation District . The Bureau of Reclamation' s current <br /> schedule calls for construction on the conveyance channel and <br /> laterals in Stage 3 to be initiated in May, 1985. In order to <br /> provide sufficient lead time to prepare designs and specifica- <br /> tions and to award a contract for construction, work on the <br /> designs and specs is scheduled to start in November or December, <br /> 1983 . <br /> The Bureau has advised that it wants the Board and the <br /> District to give their consent by November, 1983, . to the <br /> construction of Stage 3 . The Bureau has indicated that this is <br /> necessary in order for it to proceed with expenditures for the <br /> preparation of designs and specs . Recall that the resolution <br /> passed by the Board on October 7, 1982, consented only to the <br /> drilling of salvage wells in Stage 3 for test pumping purposes, <br /> said wells to be capped thereafter. <br /> At the September 8-9 Board meeting, the Bureau will report <br /> on the status of construction on the project and be prepared to <br /> respond to questions from the Board. Background information is <br /> enclosed . The Board can then take action at its November <br /> meeting. • <br /> APPENDIX E 707 <br /> Ag/9b <br /> John R.Fetcher,Chairman-Herbert H.Vandemoer,Vice Chairman <br /> C.M.Furneaux,Floyd L.Getz,Dale F.Grant,Robert A.Jackson,Richard W.Johnston,Jr.,Frederick V.Kroeger,David W.Robbins <br />
The URL can be used to link to this page
Your browser does not support the video tag.