Laserfiche WebLink
• Reservoir Operational Plan. The water users group provided their operating plan <br /> (inflow and release data) to the Corps to run the hydrologic reservoir model. Information <br /> was gathered to conduct the impact analysis for the Feasibility Report/EIS. It was later <br /> discovered that additional work to the model was necessary to make adjustments in the <br /> initial assumptions. Impacts to the adjustments are now being evaluated by State Parks <br /> and Tetra Tech. Revisions to the FR/EIS may or may not be needed as a result. <br /> • Water Quality. A Water Quality Working Group was established with the objective of <br /> assisting in identifying the potential impacts of pool changes on the Chatfield Lake's <br /> water quality. The group has reviewed pertinent data, made recommendations for <br /> methodology and model to be used for the impact analysis. The recommended <br /> methodology was carried out and the draft findings were submitted to appropriate <br /> reviewing agencies. Review comments were incorporated and the water quality modeling <br /> is essentially completed. <br /> • Project Coordination. The CWCB has met with Omaha Corps staff on several occasions <br /> to discuss contract and project management issues for the Chatfield Reallocation study. <br /> Several key decisions were made regarding the continued efforts and separation of the <br /> FR/EIS and the Ecosystem Restoration components of the process. In addition,the Corps <br /> has offered and organized a Vertical Team Meeting that will take place in late January <br /> 2007 to gain further clarification on key questions related to the study. <br /> 4. FUNDING. The following table illustrates the most up-to-date status regarding federal and <br /> non-federal project funds allocated as well as estimated funds needed to complete the study. The <br /> revised Study Cost is currently estimated to be $3,730,447. The State's share has proportionately <br /> increased to $1,865,223, of which$400,223 is for in-kind services. The sponsor has provided <br /> $1.1M cash thus far. <br /> Table 1 summarizes both the funding allocations for the Chatfield Reallocation Study. <br /> Table 1 <br /> TASK FEDERAL CWCB CWCB <br /> TASK DESCRIPTION COSTS CASH IN-KIND <br /> ($) ($) ($) ($) <br /> HYDROLOGIC STUDIES <br /> Corps Hydrologic study costs- Modeling, 382,750 254,000 128,750 <br /> evaluations, reports, document reviews <br /> Antecedent Flood Condition Study 156,200 31,200 125,000 <br /> Contract Hydrologic Costs- Modeling 115,037 89,384 25,653 <br /> (Simon &Assoc) <br /> Sub Total <br /> HYDRAULIC STUDIES <br /> Corps Hydraulic study costs -reports, 225,006 166,190 58,816 <br /> document reviews <br /> Contract Hydraulic study costs (Simon & 379,202 294,640 84,562 <br /> Assoc.) <br />