1.1 Aerial hoto ra h between Adams-Weld 120,000
<br /> p 9 p Y
<br /> and CO-NE line
<br /> 1.2 Forward HEC-2 models, suvey files, 1,752
<br /> andsurveyed cross sections.
<br /> 1.3 Cost for 1997 AutoCad surveys and 1997 50,000
<br /> HEC-2 model
<br /> 5 Obtain bridge plans between Adams-Weld 2,336
<br /> to CO-NE line
<br /> SubTotal 174,088
<br /> DOWNSTREAM DAMAGES
<br /> Contract Discharge Damages Analysis 54,677 21,871 32,806
<br /> (Tetra Tech)
<br /> Contract Discharge Damages Analysis 17,200 13,364 3,836
<br /> (Simon &Assoc.)
<br /> RECREATION IMPACTS
<br /> Contract Recreation Impact Analysis (Tetra 18,250 7,300 10,950
<br /> Tech)
<br /> Contract Recreation Impact Analysis 31,386 24,387 6,999
<br /> (Simon &Assoc.)
<br /> CO- EDAW I Study 50,000
<br /> CO - EDAW II Study 50,000
<br /> SubTotal 100,000
<br /> WATER QUALITY IMPACTS
<br /> Contract Water Quality Impact Analysis 50,716 20,286 30,430
<br /> (Tetra Tech)
<br /> Contract Water Quality Impact Analysis 2,767 2,150 617
<br /> (Simon &Assoc.)
<br /> Corps review of water quality impacts/data 5,000 4,500 500
<br /> CULTURAL RESOURCES IMPACTS
<br /> Contract Cultural Resources Impact 15,179 6,072 9,107
<br /> Analysis (Tetra Tech)
<br /> Contract Cultural Resources Impact 8,508 6,611 1,897
<br /> Analysis (Simon &Assoc.)
<br /> Corps Review Costs SHPO Coordination 4,000 4,000
<br /> ENVIRONMENTAL ANALYSIS AND
<br /> NEPA DOCUMENTATION
<br /> Contract Environmental Impact Analysis & 330,655 132,262 198,393
<br /> prepare EIS (Tetra Tech)
<br /> Contract Rare Plant Surveys (Tetra Tech) 96,166 25,600 70,566
<br /> Contract Environmental Impact Analysis & 87,732 68,168 19,564
<br /> prepare EIS (Simon &Assoc.)
<br /> Corps Environmental Analysis/EIS costs, 254,868 127,868 127,000
<br /> Report reviews, etc
<br /> U S Fish &Wildlife Coordination Reports 35,850 25,750 10,100
<br />
|