My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Memorandum Agend Item 23g 03/29,30, 1999
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Memorandum Agend Item 23g 03/29,30, 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:33:32 PM
Creation date
10/9/2014 2:16:05 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
Board Meeting Water Project Construction loan Program Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Highland Ditch Company—Foothills Reservoir Dam Rehabilitation <br /> Authorization: SB 98-1198—Severence Tax County: Boulder—W of Longmont 411 <br /> Water Source: St.Vrain River Project Yield: 450 ac.ft. <br /> Terms of Loan: $1,040,000 @ 4.0%for 30 years Project Type: Dam Rehabilitation <br /> This project is the rehabilitation of Foothills Reservoir dam, located west of Longmont in <br /> Boulder County. The dam has an inadequate spillway and severe seepage through the embankment <br /> and has had a storage restriction placed on it by the State Engineer. The Highland Ditch Company <br /> has contracted with Smith Geotechnical Engineering Consultants of Fort Collins to analyze design <br /> alternatives and complete construction plans and specifications. Construction is scheduled to <br /> commence in the fall of 1999. <br /> Boulder&Lefthand Irrigation Company—Twin Lakes Outlet Improvements <br /> Authorization: 1998 Small Project Loan Account County: Boulder—NE of Boulder <br /> Water Source: Boulder Creek Project Yield: 218 ac.ft. <br /> Terms of Loan: $50,000 @ 3.75%for 15 years Project Type: Dam Outlet Improvements <br /> This project is the reconstruction of the Boulder&Lefthand Irrigation Company reservoir's • <br /> (Twin Lakes)outlet and inlet structures. Recent State Engineer Office inspections indicate that the <br /> outlet conduit has rusted through and is functionally obsolete. Rocky Mountain Consultants of <br /> Longmont are currently preparing the improvement design with construction scheduled for late <br /> 1999. <br /> Palisade, Town of—Cottonwood Creek Pipeline Rehabilitation <br /> Authorization: HB 95-1155 County: Mesa—SE of Palisade <br /> Water Source: Cottonwood Creek Project Yield: 2,210 ac.ft. <br /> Terms of Loan: $750,000 @ 4.0%for 30 years Project Type: Pipeline Replacement <br /> This project is the 22,000 linear foot replacement of the Town of Palisades Cottonwood <br /> Creek pipeline. The proposed pipeline will be a 12 inch diameter ductile iron pipe from the outlet <br /> pipe on Cabin Reservoir to an existing pipe 5,300 feet upstream of the Town's water treatment <br /> plant. The pipe will be installed along the access road that runs through the narrow rocky canyon of <br /> Cottonwood Creek. Del-Mont Consultants, Inc. of Montrose, CO. have been contracted to <br /> complete the design plans. Construction is scheduled to commence during the summer of 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.