My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Memorandum Agend Item 23g 03/29,30, 1999
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Memorandum Agend Item 23g 03/29,30, 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:33:32 PM
Creation date
10/9/2014 2:16:05 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
Board Meeting Water Project Construction loan Program Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wood Lake Mutual Water&Irrigation Company—Wood Lake Dam Rehabilitation <br /> Authorization: SB 97-008 County: Weld—W of Eaton <br /> Water Source: Cache la Poudre River Project Yield: 3,106 ac.ft. <br /> Terms of Loan: $188,000 @ 3.75%for 30 years Project Type: Dam Rehabilitation <br /> This project is the replacement of the Wood Lake Dam outlet works including all control <br /> structures,installation of a toe drain,raising the existing saddle dam, and construction of a spillway <br /> to pass the 50% Probable Maximum Precipitation flood. The need for the improvements is a result <br /> of the State Engineer's Office dam safety requirements. Smith Geotechnical, Inc. of Fort Collins <br /> commenced design in late spring 1998. Construction is scheduled for the fall of 1999. <br /> Ryan Gulch Reservoir Company—Ryan Gulch Dam Rehabilitation <br /> Authorization: SB 99-173 County: Larimer—S. of Loveland <br /> Water Source: Big Thompson River Project Yield: 645 ac.ft. <br /> • Terms of Loan: $317,500 @4.25%for 30 years Project Type: Dam Rehabilitation <br /> This project is the rehabilitation of the Ryan Gulch Dam which includes the construction of <br /> a new spillway, lining the upstream face of the dam with a clay liner, sleeving the existing 24-inch <br /> outlet pipe, and constructing a new upstream controlled inlet works. Boyle Engineering, Inc. of <br /> Denver has been contracted to complete the project design which is scheduled for construction for <br /> the fall of 1999. <br /> Riverside Reservoir and Land Company—Riverside Reservoir Spillway Rehabilitation <br /> Authorization: SB 98-1189 County: Weld—NW of Wiggins <br /> Water Source: South Platte River Project Yield: 200 ac.ft. <br /> Terms of Loan: $450,000 @ 3.75%for 20 yrs. Project Type: Spillway Rehabilitation <br /> This project is the construction of an emergency spillway on the Riverside Reservoir Dam, <br /> located 11 miles northwest of Wiggins in Weld County. The State Engineer has placed a storage <br /> • restriction on the reservoir until an emergency spillway is completed. The Riverside Reservoir and <br /> Land Company contracted with W.W. Wheeler and Associates of Denver to prepare construction <br /> plans and specifications. The State Engineer's office is currently reviewing the plans with <br /> construction scheduled to commence and be completed in late 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.