My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Memorandum Agend Item 23g 03/29,30, 1999
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Memorandum Agend Item 23g 03/29,30, 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:33:32 PM
Creation date
10/9/2014 2:16:05 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
Board Meeting Water Project Construction loan Program Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Johnstown, Town of-Raw Water Pipeline <br /> Authorization: SB 94-29 County: Larimer/Weld—W of Johnstown <br /> Water Source: Big Thompson River Project Yield: 2,200 ac.ft. <br /> Terms of Loan: $2,500,000 @ 4%for 30 years Project Type: Pipeline Construction <br /> The project includes the replacement of 11 miles of open ditch with a 14-16 inch pipeline <br /> from Lonetree Reservoir to the Town of Johnstown's water treatment plant including a booster <br /> station at the reservoir and connection facilities at the treatment plant. PRC Environmental <br /> Management, Inc. of Denver designed the project. The construction contract was awarded to Hall- <br /> Irwin Construction Co. of Greeley and B.T. Construction, Inc. of Broomfield August 6, 1996: <br /> Construction commenced in early October 1996 and was completed in June 1997. Project <br /> documentation and final accounting is currently underway with substantial completion scheduled in <br /> May 1999. <br /> Excelsior Irrigating Company-Excelsior Ditch Rehabilitation <br /> Authorization: SB 97-008 County: Pueblo—E of Pueblo <br /> Water Source: Arkansas River Project Yield: 4,250 ac.ft. <br /> • Terms of Loan: $230,000 @ 3.75%for 30 yrs Project Type: Ditch Rehabilitation <br /> This $335,000 project is the re-construction of approximately 2 miles of open ditch, which <br /> has previously been abandoned and farmed over. Also included in the project is the construction of <br /> several pump stations for water delivery. The project is located in Pueblo County 10 miles east of <br /> Pueblo. Project design was prepared by the Pueblo Office of the Natural Resource Conservation <br /> Service, Ralph Adkins, P.E. of Pueblo, Irrigation Engineering of Alamosa and Hendrooke <br /> Sprinklers of Ft. Collins. Project construction commenced by the owner and several sub- <br /> contractors in May 1998 with project completion scheduled for May 1999. <br /> Julesburg Irrigation District—Harmony Ditch#1 Diversion Structure Rehabilitation <br /> Authorization: Emerg. Infrastructure Repair Account County: Logan—SW of Crook <br /> Water Source: South Platte River Project Yield: 40,000 ac.ft. <br /> Terms of Loan: $590,000 @ 3.75%for 30 years Project Type: Diversion Rehabilitation <br /> This project is the emergency rehabilitation of the Julesburg Irrigation District's Harmony <br /> Ditch #1 diversion structure on the South Platte River 4 miles southwest of Crook. The structure <br /> • was damaged by the 1997 South Platte floods and is critical to the operation of the Company's <br /> Julesburg Reservoir. Zoyiopoulos & Associates of Greeley prepared the design plans and the <br /> construction contract was awarded to Concrete Specialties, Inc. of Sterling in early January 1999. <br /> Construction is currently 30%complete with substantial completion scheduled for May 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.