My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Memorandum Agend Item 23g 03/29,30, 1999
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Memorandum Agend Item 23g 03/29,30, 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 12:33:32 PM
Creation date
10/9/2014 2:16:05 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
Board Meeting Water Project Construction loan Program Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Summit Reservoir and Irrigation Company—Summit Reservoir and Ditch System Rehab. <br /> Authorization: SB 97-008 County: Montezuma—NE of Cortez • <br /> Water Source: Lost Canyon Creek Project Yield: 4,287 ac.ft. <br /> Terms of Loan: $200,000 @ 3.75%for 30 years Project Type: Reservoir and Ditch Rehab. <br /> This project is the rehabilitation of the Summit Reservoir Dam outlet works and the <br /> construction of repairs and improvements to the Summit Reservoir and Irrigation Company's water <br /> collection and distribution facilities. The Cortez office of the Natural Resource Conservation <br /> Service prepared the construction plans and specifications with the construction contract recently <br /> awarded to Noland,Inc. of Mancos, CO. Construction is scheduled for completion in the spring of <br /> 1999. <br /> Pinon Mesa Ranches Community Association-Rural Raw Water System Construction <br /> Authorization: SB 97-008 County: La Plata—W of Ignacio <br /> Water Source: Florida River Project Yield: 125 ac.ft. <br /> Terms of Loan: $258,000 @ 3.75%for 30 yrs Project Type: Diversion and Dist. System <br /> This$345,000 project is the construction of a new rural raw water irrigation and distribution <br /> system in La Plata County west of Ignacio. The project consists of construction of a concrete <br /> diversion structure and pump station at the Florida River,a transmission pipeline from the diversion <br /> to a storage impoundment, and construction of approximately 9,000 feet of distribution pipeline <br /> from the storage impoundment to the water users. RMI Environmental Services of Farmington, <br /> New Mexico prepared the project design. Project construction commenced September 2, 1997 by <br /> RMI Environmental Services of Farmington,New Mexico (a design/build contractor). The project <br /> is currently 70%complete and continues to be on indefinite hold due to and financial problems. <br /> Fort Morgan, City of —NCWCD Southern Pipeline Extension <br /> Authorization: SB94-029, SB98-1189, Svrnce Tax County: Weld/Morgan—W of Ft. Morgan <br /> Water Source: Colo.-Big Thompson/Windy Gap Project Yield: 6,877 ac.ft. <br /> Terms of Loan: $5,500,000 @ 4%for 40 years Project Type: Pipeline Construction <br /> $8,000,000 @ 4%for 30 years <br /> This project is an extension of the Northern Colorado Water Conservancy District's <br /> Southern Pipeline Project. The pipeline extension will provide high quality western slope water to <br /> the City of Fort Morgan for their municipal use. Montgomery Watson, Inc. of Denver completed <br /> the project design, from the Hudson/Ft. Lupton extension at Platteville,to the Fort Morgan area, in <br /> • <br /> June. The construction contract was awarded to BRB Contractors, Inc. of Topeka, Kansas and <br /> construction commenced September 1, 1998. Construction is approximately 55% complete with <br /> project completion scheduled for late 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.